Laserfiche WebLink
<br />Resolution No. PC-96-79 <br />Page 10 <br /> <br />58. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation of litter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />59. The restaurant shall include a contained area for cleaning mats, containers, and <br />equipment. The wash area shall be covered or shall be designed to prevent runoff onto or <br />from the area. The area shall be connected to the sanitary sewer, subject to approval by <br />DSRSD, or shall be collected in a containment area and removed regularly by a disposal <br />and recycling service. If connected to the sanitary sewer, a structural control such as a <br />sand filter or oil/ water separator shall be used, and a sign shall be posted prohibiting the <br />dumping of hazardous materials. Other methods may be used subject to the approval of <br />the Director of Building Inspection. The applicant shall instruct employees to conduct all <br />washing activities in this area. <br /> <br />60. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping -- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />61. The applicant shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris <br />from entering the storm drain system. Such measures may include, but are not limited to, <br />hydroseeding, hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Director of Building Inspection. Ifno grading plan is <br />required, necessary erosion control/storm water quality measures shall be shown on the <br />site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The applicant is responsible for ensuring that the <br />contractor is aware of and implements such measures. <br /> <br />62. All metal roofs shall be finished with rust-inhibitive paint. <br /> <br />63. The applicant shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br />