Laserfiche WebLink
· Page 2 November 30, 2004 <br /> <br /> REVISED SCOPE OF WORK <br /> <br />The following additional tasks are required to address the changes in the design requirements for the <br />proiect. The tasks include design work by LTD Engineering and work by our two subcontractors - <br />Balance Hydrologics performing hydraulic modeling and LSA Associates preparing revegetation plans, <br /> <br /> Task I - Revise Hydraulic Modeling <br /> <br />Elimination of the diversion through the Applied BioSystems property changes the flow in the lower <br />reach of Mission Creek and the upper reach of Sycamore Creek. The HECRAS model will need to be <br />revised to reflect the changed flow conditions. The revised modeling will provide the hydraulic <br />information necessary to revise the grading plans so that sufficient capacity is provided for the 100-year <br />flow. <br /> <br />Task 2 - Revise Grading Plans for Mission Creek and Upper Sycamore Creek <br />The change in flow conditions along the lower reach of Mission Creek and the upper reach of <br />Sycamore Creek will require changes in the grading plans to make sure the channel contains the 100- <br />year flow without overtopping. The revegetation plans will need to be revised to correspond with the <br />revised grading plans, <br /> <br />Task 3 - Revise Grading Plans for Phased Construction <br /> <br />The City now plans to construct the project in at least three phases. This necessitates a revision to the <br />drawings and preparation of new drawings for interim construction to make sure flood flow capacity is <br />maintained before completion of the entire project. The revegetation plans will atso need to be revised <br />to correspond with the revised grading plans. Eight new drawings are required as a result of this <br />change. <br /> <br />Task 4 - Revise Grading Plans to Avoid San Francisco Water Pipeline <br /> <br />The City's decision to eliminate grading along the reach of Sycamore Creek adjacent to the City of San <br />Francisco's water pipeline (between 1-680 and the wooden bridge west of 1-680) requires that we <br />prapars a new hydraulic analysis and grading plan for the reach. The revegetation plans will also need <br />to be revised to correspond with the revised grading plans. Four new drawings are required as a result <br />of this revision. <br /> <br />Task 5 - Coordinate Stream Channel Design with Bemal Park Plans <br />The City recently retained an architect to develop plans for the Bemal Park. The need to coordinate the <br />design with the park design architect has already required one meeting. Additional meetings, drawing <br />reproduction, drawing revisions and other work is anticipated during the process of developing plans for <br />the stream channel and treatment wetland that are compatible with the park design. <br /> <br />Task 6 - Meetings <br /> <br />Additional meetings with City staff, developers and park architects will be required to coordinate the <br />various changes in the project design and the phasing of the construction. We assume that a <br />maximum of four future meetings will be required. If additional meetings are required, the budget wilt <br />need to be increased accordingly. <br /> <br /> <br />