Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />4. REVISIONS AND OMISSIONS TO THE AGENDA <br /> <br />Mr. Iserson requested the Commission to continue Item 6.a.. PUD-81-30-71D. Securitv Caoital <br />Pacific Trust/Prudential, and Item 6.b.. Suecific Plan Amendment (SPA-97-02. Downtown <br /> <br />gne":f:,, Plan\ and Planned Un:t Develooment <PUD-97-08. "Rav Street VilIa2e"\. Trumark <br />Homes/Pine Street ProDerties to August 13, 1997. <br /> <br />5. MATTERS CONTINUED FOR DECISION <br /> <br />There were none. <br /> <br />6. PUBLIC HEARINGS <br /> <br />c. PUD-80-02-15D. Parkwav Prouerties. Inc. <br />Application for design review approval to construct a two-story, 34,000-square foot office <br />building ("Birch Court") located at 7077 Koll Center Parkway. Zoning for the property is PUD <br />(Planned Unit Development) - I/C-O (Industrial/Commercial-Office) District. <br /> <br />Mr. Iserson presented the staff report recommending approval of Case PUD-80-02-15D, subject to <br />the conditions of the staff report. He noted that this application is for a modification of a previously <br />approved two single-story buildings for the same site, with an increase in floor area by 7,700 square <br />feet. The floor area ratio (FAR), which is locked in by the Development Agreement in effect for <br />Bernal Corporate Park, is 34 %, well within the General Plan range and below the General Plan- <br />recommended midpoint of 35 %. A revised traffic report indicates an increase of 10 vehicular trips <br />with a negligible impact on the levels of service at various intersections, but well within the limits <br />of the Development Agreement. The applicant will provide free shuttle service to and from the <br />BART station and will construct mitigation measures as conditioned in the previously approved <br />project. Parking is adequate; the proposed parking stalls will be universal-size, which allows for <br />both standard- and compact-size cars. However, since this dimensional standard is not yet allowed <br />in this PUD, the applicant will have to either receive approval for a PUD modification or revise the <br />dimensions to standard and compact sizes. <br /> <br />Commissioner Kumaran noted that the original approval of the two one-story buildings would have <br />required a larger footprint. He inquired if the number of parking spaces per square foot was met <br />by that project. <br /> <br />Mr. Iserson said it met the parking standards at the time the project was approved. <br /> <br />Mr. Kumaran commented that the ratio of one parking space per 250 square feet seemed low. He <br />inquired if this is a standard and how this was arrived at. <br /> <br />Mr. lserson replied that the computation excludes stairwells and elevator shafts, in addition to the <br />fact that there are shared common areas in office buildings that are not devoted to office space, such <br />a lobbies, hallways, and entryways. This ratio is determined by traffic engineers who do surveys <br />and studies on different kinds of office buildings and the average floor area; the number of <br />employees and how many of them carpool; how many parking spaces the employees fill up and how <br />many are needed for visitors. Based on recent field studies, staff has determined that one parking <br /> <br />Planning Commission Minutes <br /> <br />Page 2 <br /> <br />July 23, 1997 <br />