My WebLink
|
Help
|
About
|
Sign Out
SR 05:027
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2005 3:59:07 PM
Creation date
1/5/2005 10:48:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/11/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 12 <br />Citvwide Change in Vehicle Hours Traveled if the Dublin Canyon Road Widening <br />Were Removed from the General Plan Roadway Network <br /> <br /> Morning Peak Hour Traffic <br /> Local Collector Minor Major <br />Trip Purpose Streets Streets Arterials Arterials Total <br />Home / Work 0 0 1 0 I Hours spent driving <br />Home / School 0 0 0 0 0 Hours spent driving <br />Home / Shop / Social / Recreation 0 0 0 0 0 Hours spent driving <br />Not to / from Home 0 0 0 0 0 Hours spent driving <br />Total 0 0 2 0 1 Hours spent driving <br /> <br />Morning Cut-through traffic 0 0 1 0 1 Hours spent driving <br /> <br /> Table 13 <br />Citywide Change in Vehicle Hours Traveled if the Dublin Canyon Road Widening <br />Were Removed from the General Plan Roadway Network <br /> <br /> Morning Peak Hour Traffic <br /> Local Collector Minor Major <br />[rip Purpose Streets Streets Arterials Arterials Total <br /> <br />Home / Work 0 <br />Home / School 0 <br />Home / Shop / Social / Recreation 0 <br />Not to / from Home 0 <br /> <br />0 -1 -3 -5 Miles Traveled <br />0 0 0 0 Miles Traveled <br />0 0 -1 -2 Miles Traveled <br />0 0 -1 -1 Miles Traveled <br /> <br />Total 0 -1 -2 -6 -8 Miles Traveled <br /> <br />Morning Cut-through traffic <br /> <br />0 0 -1 0 -I Miles Traveled <br /> <br />Morning Peak Hour Cut-through Traffic <br />The 1996 General Plan Roadway Network Model projects that about 240 cut-through vehicles <br />use this roadway during the morning peak hour. Most of this traffic is eastbound into the City. <br />The number of cut-through vehicles on City streets would remain about the same during the <br />morning peak hour if Dublin Canyon Road is not widened as shown in the 1996 General Plan. <br /> <br />Morning Peak Hour Congestion Levels <br />At the 135 study intersections, traffic volumes collectively decrease by about 100 vehicles per <br />hour (VPH) during the morning peak hour when the Dublin Canyon Road widening is removed <br />from the 1996 General Plan Roadway Network. Traffic collectively decreases by about 19 VPH <br />at the 24 intersections in the City with 35 seconds or more of average delay, and collectively <br />decreases by 83 VPH at the 111 other study intersections when the roadway widening is <br />removed from the network. <br /> <br />SR 05:027 <br />Page 46 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.