Laserfiche WebLink
<br />Resolution No. PC-96-64 <br />Page 16 <br /> <br />On-Site Operations <br /> <br />64. All existing wells on the site shall be removed or sealed, filled and abandoned pursuant to <br />Alameda County Ordinance 73-68, prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for construction water. Any wells <br />designated for abandonment or any wells, encountered during construction, are to be <br />destroyed in accordance with a permit obtained from Zone 7. <br /> <br />65. All existing septic tanks or holding tanks shall be removed or sealed, filled, and abandoned, <br />pursuant to the requirements of the Alameda County Department of Health Services. <br /> <br />66. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />67. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />68. The haul route for all materials to and from this development shall be approved by the City <br />Engineer prior to the issuance of an encroachment permit. <br /> <br />69. The applicant shall submit a construction Best Management Practices (BMP's) program for <br />review and approval by the Planning Director prior to issuance of building and/or grading <br />permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the approved <br />construction BMP may result in the issuance of correction notices, citations, or a stop work <br />order. <br /> <br />70. The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed an a weekly basis. When appropriate, use tarps on <br />the ground to collect fallen debris or splatters that could contribute to storm water runoff <br />pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement and <br />storm drains adjoining the site. Limit construction access routes onto the site and place <br />gravel on them. Do not drive vehicles and equipment off paved or graveled areas during <br />wet weather. Broom sweep the street pavement adjoining the project site on a daily basis. <br />Scrape caked-on mud and dirt from these areas before sweeping. <br />