Laserfiche WebLink
<br />Resolution No. PC-96-56 <br />Page 7 <br /> <br />32. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the developer is participating in the program. Notwithstanding <br />the developer's participation in such a program, the City may withhold building permits if <br />the City determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br />Building <br /> <br />33. The project shall be constructed to meet Title 24 state energy requirements. <br /> <br />34. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />35. The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasanton. These plans shall be approved by the Director of <br />Building Inspection prior to the issuance of a building permit. The site development plan <br />shall include all required information to design and construct site, grading, paving, <br />drainage, and utilities. Specific items to be indicated on the site development plan <br />necessary to construct the improvements are to be in accordance with the City of <br />Pleasanton Private Development Design Guidelines adopted April 15, 1986. <br /> <br />36. The paving sections for the on-site parking and drive areas shall be designed on the basis <br />of an R-Value test and a traffic index to carry the anticipated traffic loads. This design <br />shall be subject to the approval of the Director of Building Inspection. The minimum <br />paving section shall be 2" A.C. on 6" of A.B. The minimum A.C. pavement slope shall <br />be I %. For pavement slopes of less than 1%, the surface runoff shall be carried in a <br />concrete gutter to an acceptable point of discharge. The minimum slope for concrete <br />gutter shall be 0.5%. <br /> <br />37. A sanitary sewer sampling manhole shall be provided on each of the sanitary sewer <br />lateral from each building, unless otherwise waived by the Director of Building <br />Inspection. <br /> <br />38. Prior to issuance of a building permit, the applicant shall pay the applicable Zone 7 and <br />City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the developer shall pay any applicable DSRSD sewer permit fee. <br /> <br />39. Building and situs plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br />