<br />Resolution No. PC-96-28 <br />Page 12 <br /> <br />g. The developer is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />I) Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />2) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access routes <br />onto the site and place gravel on them. Do not drive vehicles and equipment off <br />paved or graveled areas during wet weather. Broom sweep the street pavement <br />adjoining the project site on a daily basis. Scrape caked-on mud and dirt from <br />these areas before sweeping. <br /> <br />3) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any debris <br />or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br /> <br />4) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have <br />the potential of being discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />5) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br /> <br />6) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street, gutters, or storm drains. <br />