Laserfiche WebLink
<br /> <br /> <br /> <br />the building permit plans submitted to the Building and Safety Division. The Checklist <br />shall include notation indicating the sheet(s) the measure can be found. Prior to building <br />permit final, all of the measures indicated on the approved checklist shall be inspected <br />and approved by the City of Pleasanton. <br /> <br />Construction Practices and Noticing <br /> <br />15. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Friday. No construction shall be allowed on Sta te or <br />Federal Holidays, Saturdays or Sundays. The Director of Community Development may <br />allow earlier “start times” or later “stop times” for specific construction activities, e.g., <br />concrete pouring. All construction equipment shall meet Department of Moto r Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. Prior to <br />construction, the hours of construction shall be posted on site. <br /> <br />16. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br />vehicle are not allowed on the construction site except when needed as sleeping <br />quarters for a security guard subject to receipt of a temporary conditional use permit <br />(per PMC 18.116.010.E). <br /> <br />17. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br /> <br />18. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br />project site and as far as possible from existing residences and shall be emptied to <br />prevent odor. <br /> <br />19. DISTURBANCE COORDINATOR: The applicant shall designate a “disturbance <br />coordinator” who shall be responsible for responding to any complaints regarding <br />construction noise, dust, construction parking, etc. The coordinator (who may be an <br />employee of the general contractor) shall determine the cause of the complaint and <br />shall require the implementation of reasonable measures warranted to correct the <br />problem. A telephone number of the disturbance coordinator shall be posted on the <br />construction site fence. The sign shall also list an emergency after-hours contact <br />number for the disturbance coordinator, or designee. <br /> <br />20. DUST CONTROL: The applicant shall submit a written dust control plan or procedure as <br />part of the building permit plans. <br /> <br />21. CUTRUAL RESOURCES: If any prehistoric or historic artifacts, or other indication of <br />cultural resources are found once the project construction is underway, all work shall <br />stop within 20-meters (66 feet) of the find. A qualified archaeologist shall be consulted <br />for an immediate evaluation of the find prior to resuming groundbreaking construction <br />activities within 20-meters of the find. If the find is determined to be an important <br />archaeological resource, the resource shall be either avoided, if feasible, or recovered <br />Docusign Envelope ID: 690AB28A-6A62-4ECB-9309-BC535EFC672BDocusign Envelope ID: 36B10924-68B9-4DAB-B45F-74C5F45ECB94