My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
091625 REGULAR
>
CITY COUNCIL REGULAR MEETING SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:31:01 PM
Creation date
10/10/2025 3:17:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2025
DESTRUCT DATE
15Y
DOCUMENT NO
REGULAR MEETING SUPPLEMENTAL MATERIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> MEMORANDUM <br /> <br />Date: September 16, 2025 <br /> <br />To: Mayor and City Council <br /> <br />From: Gerry Beaudin, City Manager <br />Siew-Chin Yeong, Director of Public Works <br /> <br />Subject: City Council Agenda Item 14 – Ratify a Contract with DPI Construction, Inc. for <br />the Emergency Sewer Pipe Replacement at Denker Drive. Request to Amend <br />the recommendations to increase project costs from $500,000 to $650,000. <br /> <br /> <br />During the emergency sewer line repair on Denker Drive and Inglewood Drive, the contractor <br />encountered large underground voids outside of the initial failed sections. These voids, <br />caused by soil loss through the failed sewer line, created unstable trench conditions that <br />required additional excavation and expanded pavement restoration than was estimated. <br /> <br />The work was performed on a time-and-materials basis, and the initial pricing received from <br />DPI Construction, Inc. indicates that project costs will exceed the previously estimated <br />$500,000. <br /> <br />Staff recommend increasing the total project budget from $500,000 to $650,000 to cover all <br />costs incurred. Sufficient funding is available in the Sewer Replacement CIP to support the <br />additional $150,000. <br /> <br />RECOMMENDATION <br />1. Ratify a contract with DPI Construction, Inc. in the not-to-exceed amount of $650,000 for <br />the emergency sewer pipe replacement at Denker Drive. <br /> <br />2. Approve the creation of the Capital Improvement Program (CIP) project, Denker Drive <br />Emergency Sewer Repairs, CIP No. 26203, to the approved 5-year CIP for FY 2025/26, <br />and the budget amendment to appropriate $650,000 from the Sewer Replacement CIP <br />(Fund 431). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.