My WebLink
|
Help
|
About
|
Sign Out
PC-97-97
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:10 AM
Creation date
12/29/2004 1:35:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/10/1997
DOCUMENT NO
PC-97-97
DOCUMENT NAME
PUD-81-30-73D
NOTES
ADG DEVT & INVESTMENT
NOTES 3
2-STORY OFFICE BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-97 <br />Page 7 <br /> <br />Building Permit Review: <br /> <br />31. The building covered by this approval shall be designed and constructed to meet Title 24 <br />state energy requirements. <br /> <br />32. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />33. The developer shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasant on. These plans shall be approved by the Director of Building <br />Inspection prior to the issuance of a building permit. The site development plan shall <br />include all required information to design and construct site, grading, paving, drainage, <br />and utilities. Specific items to be indicated on the site development plan necessary to <br />construct the improvements are to be in accordance with the City of Pleasanton Private <br />Development Design Guidelines adopted April 15, 1986. <br /> <br />34. All retaining walls higher than four feet (4' 0") from the top of the wall to the bottom of <br />the footway shall be constructed of reinforced concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall plans. <br /> <br />35. The developer shall submit two copies of the site soils report to the Director of Building <br />Inspection for third party peer review and shall pay for such review at the time specified <br />by the Director, but in all cases before the issuance of a grading permit. <br /> <br />36. Building and situs plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br /> <br />Coustruction Requirements: <br /> <br />37. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. <br /> <br />38. At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed from the site <br />at the end of each work day. <br /> <br />39. Final inspection by the Planning Department is required prior to occupancy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.