Laserfiche WebLink
Exhibit A - Scope of Work 2025 <br />Rev. 3/26/2025 Page 10 <br />Debris of silt resulting from erosion and other landscape debris, shall be removed from <br />sidewalks, gutters and driveways. <br /> <br />3.06 Drainage Systems Maintenance <br /> <br />A. All drainage systems on the properties for purposes of rainwater or irrigation <br />water collection, whether surface swales, French drains, catch basins, dry <br />wells, creeks, streams or underground pipes, shall be maintained in a clean <br />condition free of debris, erosion waste, weeds or any blockage. Natural <br />creeks and streams are not included. <br /> <br />B. When a drainage system is blocked by debris from off the site or by erosion <br />waste from off-site major storm damage, correction will be made by the City <br />after prompt notification by the Contractor or considered “Extra Work” as <br />approved by the City. <br /> <br />3.07 Erosion Control <br /> <br />The Contractor shall not be responsible for structural maintenance or repair or <br />replacement of the following: parking areas, driveways, streets, or sidewalks except for <br />such structural maintenance, repair or replacement resulting from damage caused by the <br />Contractor or his agents. <br /> <br />A. Erosion resulting from failure to maintain properly rooted plant material on <br />slopes shall be the responsibility of the Contractor to correct and accomplish <br />necessary cleanups. <br /> <br />B. Erosion resulting from major storm damage that requires major slope <br />reconstruction and/or installation of additional drainage facilities shall be the <br />City’s responsibility. <br /> <br />3.08 Records <br /> <br />Written records of watering schedules, fertilization, pest control spraying, and other <br />maintenance work shall be maintained by the Contractor. Written records describing all <br />products and materials used during maintenance also shall be maintained by the <br />Contractor. A copy of the record shall be provided to the City on a monthly basis. <br /> <br />3.09 Control, Supervision and Approval Authority <br /> <br />A. Unless otherwise provided by specific provisions, Contractor’s operations and <br />activities pursuant to this agreement shall be under the control and supervision <br />of the Director of Engineering or his authorized representative, and such <br />person shall exercise such control and supervision for and on behalf of the <br />City where so designated in this agreement. <br /> <br />B. Whenever, under the provisions of this agreement, the Contractor is prohibited <br />from doing something unless Contractor first obtains the approval or consent <br />Docusign Envelope ID: 13FE48C5-D5F5-4601-826E-B8F264A57D7BDocusign Envelope ID: 7C0E76E7-1031-45FB-8C1F-DF2FE0E6CF0B