My WebLink
|
Help
|
About
|
Sign Out
TREE SCULPTURE GROUP DBA TERRA LANDSCAPE (#2025622)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
T
>
TREE SCULPTURE GROUP DBA TERRA LANDSCAPE (#2025622)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2025 5:00:28 PM
Creation date
9/15/2025 4:52:46 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
TREE SCULPTURE GROUP, INC.DBA TERRA LANDSCAPE
Contract Record Series
704-05
Munis Contract #
2025622
Contract Expiration
6/30/2028
NOTES
CONTRACTOR PROVIDING LANDSCAPE SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A - Scope of Work 2025 <br />Rev. 3/26/2025 Page 9 <br />unimpeded coverage. <br /> <br />D. Set and program automatic controllers for seasonal water requirements. Give <br />City’s representative a key to controller, and instructions on how to turn off <br />system in case of emergency. <br /> <br />E. The irrigation system shall be adjusted as necessary to prevent overspray onto <br />paved areas and run-off down the gutters. Contractor shall be specifically <br />responsible for identifying areas of inadequate coverage, over-watering and <br />system malfunctions, and making proper adjustments or repairs. Contractor <br />shall adjust times to provide necessary water. Multiple repeat cycles shall be <br />utilized as needed to provide best irrigation efficiency. <br /> <br />F. Repair and replace as necessary, the irrigation system and all its piping from <br />the backflow prevention device to each of the irrigation heads. It is <br />understood that throughout the life of the project, incidental replacement of <br />irrigation heads and risers, quick couplers, valves and piping will be necessary <br />due to vandalism, vehicle damage, malfunction, and so on. Repair and/or <br />replacement of all damaged sprinkler heads and riser assemblies, quick <br />couplers, valves and piping are a part of this contract, and will be paid <br />for as “Extra Work”. Provide receipt for materials as verification for “extra” <br />reimbursables. <br /> <br />G. Maintain in good condition all automatic sprinkler valve boxes and their cover <br />lids. This includes removal of any plant growth inside of the boxes, and <br />removing any excessive dirt or debris from inside box so that valve is <br />completely exposed inside of box. Standing water in the valve boxes shall not <br />be allowed to remain permanently. <br /> <br />H. All valves should be kept in such condition that they are able to be manually <br />operated at the box by the air bleed pet-cock. <br /> <br />I. The height of all sprinkler control boxes shall be maintained at approximately <br />one-half (1/2) inch above the surface of the surrounding grade. <br /> <br />J. Repair and replace all quick coupling valves and lines which are not operating <br />properly. <br /> <br />K. Repairs to clocks, wiring or necessary system modifications shall be the <br />Contractor’s responsibility; however, they are considered as “Extra Work”. A <br />cost estimate shall be provided to the City and such repair shall be approved <br />by the City prior to initiation. <br /> <br />L. Moisture in soil shall be checked with a soil probe to determine moisture <br />requirements for all plant areas. <br /> <br />3.05 Sidewalks and Driveways <br /> <br />Docusign Envelope ID: 13FE48C5-D5F5-4601-826E-B8F264A57D7BDocusign Envelope ID: 7C0E76E7-1031-45FB-8C1F-DF2FE0E6CF0B
The URL can be used to link to this page
Your browser does not support the video tag.