Laserfiche WebLink
<br />Resolution No. PC-97-84 <br />Page 7 <br /> <br />24. The applicant shall include erosion control measures on the final grading plan. The <br />applicant is responsible for ensuring that the contractor is aware of such measures. All cut <br />and fill slopes shall be revegetated and/or stabilized as soon as possible after completion of <br />grading, or by October 15, whichever occurs first. If permanent landscaping is not in <br />place by October 15, no grading shall occur unless approved erosion control measures are <br />to the satisfaction of the Building Department. Such measures shall be maintained by the <br />owner until such time as permanent landscaping is established. <br /> <br />25. No construction materials shall be stored within public rights-of-way. <br /> <br />26. If the rim elevation of the upstream public sanitary sewer is at an elevation higher than the <br />lowest portion of the building pad, a back-flow prevention device (check valve) shall be <br />installed on the lateral between the house and public sanitary sewer line. <br /> <br />27. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />28. The applicant shall submit a pad elevation certification prepared by a licensed land <br />surveyor or registered civil engineer, to the Chief Building Official and Planning Director, <br />certifYing that the pad and building locations are per approved plans, prior to receiving a <br />foundation inspection for the structure. <br /> <br />29. Dust and mud shall be contained within the boundaries of the property during times of <br />construction. <br /> <br />FIRE AND POLICE <br /> <br />30. The home shall be constructed with Class A fire retardant roofing material to the <br />satisfaction of the Fire Marshall. The applicant is responsible for the relocation of the <br />emergency vehicle access gate to the satisfaction of the Fire Marshall. The gate shall be <br />installed to the satisfaction of the Fire Marshall prior to occupancy. <br /> <br />31. The home shall be equipped with an automatic residential fire suppression system if <br />required by the Fire Marshall. <br /> <br />32. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction equipment must meet <br />DMV noise standards and shall be equipped with muffling devices. <br />