Laserfiche WebLink
<br />Resolution No. PC-97-71 <br />Page II <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br />Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and/or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter particles <br />in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the project <br />site that have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />66. The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and approval <br />prior to issuance of building permits. The structural control shall be cleaned at least twice <br />a year: once immediately prior to October I and once in January. The applicant shall enter <br />into a maintenance agreement for the oil/water separator with the City. <br /> <br />67. The trash enclosure area( s) shall be completely covered. An area drain shall be installed in <br />the enclosure area which connects to the sanitary sewer. No other area shall drain into the <br />trash enclosure; a berm shall be installed to prevent such drainage iffound necessary by <br />the City Engineer/Director of Building Inspection. <br /> <br />68. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping __ <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection <br /> <br />{ end} <br />