Laserfiche WebLink
<br />Resolution No. PC-97-71 <br />Page 10 <br /> <br />59. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this development <br />and all upstream areas intended to be drained through this development. <br /> <br />60. Electric power distribution, gas distribution, communication service, cable television, and <br />any required alarm systems shall be installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer or Director of Building Inspection <br />for on-site <br /> <br />61. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />62. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site <br /> <br />63. The applicant shall comply with the City's non-point storm drain ordinance. <br /> <br />64. The applicant shall submit a construction Best Management Practice (BMP) program for <br />review and approval by the Planning Director prior to issuance of any building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed in this program. Failure to comply <br />with the approved construction BMP may result in the issuance of correction notices, <br />citations, or a project stop work order. <br /> <br />65. The applicant is responsible for implementing the following measures during all <br />construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps on <br />the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles off <br />paved areas. <br />