Laserfiche WebLink
Historically, the General Fund contribution has been used for a full range of Facilities, Parks Miscella- <br />neous and Street projects, and the CIP will continue this practice. Some of the projects that will be fund- <br />ed through the General Fund contributions include West Las Positas Boulevard Multimodal Reconstruc- <br />tion, Library Fire Alarm Replacement, and Non -Functional Turf Replacement. <br />An internal assessment estimated $900 million in CIP and Repair & Replacement needs over the next <br />decade, prior to the implementation of the Asset Management Program, to maintain infrastructure and <br />other assets in a "state of good repair". The Asset Management Plan is scheduled to be completed by <br />year-end 2025 and will provide a complete asset list with high-level condition assessment and a prior- <br />itized implementation plan linked to a long-term funding strategy. Staff may provide additional rec- <br />ommendations to adjust the FY 2026-2030 Capital Improvement Program during the two-year budget <br />cycle, based on the results of the Asset Management Plan. Refer to Appendix A for a listing of unfunded <br />projects. <br />SUMMARY OF CIP EXPENDITURES <br />The CIP includes a total of 40 capital projects recommended for funding during the five years of this <br />CIP and reappropriating funding for 18 reserve projects in FY 2026/27. The Proposed Capital Budget for <br />the next two years includes approximately $54.0 million and $32.0 million in expenditures for capital <br />and reserve projects in FY 2025/26 and FY 2026/27, respectively, for a total of $86.0 million. Total five- <br />year anticipated expenditures for capital projects in the CIP are estimated at $221.7 million. It should be <br />noted that Other Expenditures of approximately $2.5 million in the first two years, and $6.5 million over a <br />five-year period, consist of interfund transfers for operating costs and payments of approximately $2.2 <br />million for the California State Water Resources Control Board State Revolving Fund Loan. Combined, <br />the overall expenditure included in the CIP is $228.2 million over a five-year period, including $62.4 <br />million in anticipated debt for sewer and water enterprise projects to help meet regulatory compliance <br />and system health. <br />A summary of the major funded projects is below: <br />Transportation and Streets <br />• $35.6 million for the West Las Positas Boulevard Multimodal Reconstruction: $17.0 million for the five- <br />year CIP and an estimated $18.6 million in current funding for the pavement reconstruction project. <br />Phase 1 will be between Willow Road to Stoneridge Drive, reconstructing or replacing portions of the <br />roadway and sidewalk, including pedestrian, bicycle, and transit improvements. <br />$22.7 million for Annual Street Resurfacing & Reconstruction: the first year's funding is being ap- <br />plied toward West Las Positas Boulevard Multimodal Reconstruction. In recent years, funding for this <br />project has generally ranged between $3.0 million and $4.0 million. The addition of the Pleasanton <br />Garbage Service vehicle impact fee with proposed annual funding of approximately $6.0 million <br />over the five-year period will allow the City to improve the maintenance for local roads and streets. <br />The actual streets to be resurfaced will be determined following an update to the City's pavement <br />management system. Notwithstanding this funding, staff anticipates that additional street mainte- <br />nance funding will be needed in the future to meet ongoing street maintenance needs to maintain <br />the current pavement condition index. <br />$11.3 million over a five-year period for various street related maintenance and improvement proj- <br />ects, including Annual Slurry Sealing of Various Streets ($6.0 million), Annual Curb & Gutter & ADA <br />Ramp ($3.6 million), Annual Sidewalk & ADA Ramp ($0.8 million) for installation of curb and gutter <br />and ADA curb ramps, Annual Safety Improvements at Various Locations ($0.6 million), and Annual <br />Traffic Buttons & Line Markers Installation ($0.3 million). These funded amounts are consistent with <br />funding in recent years. <br />14 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />