My WebLink
|
Help
|
About
|
Sign Out
PC-2025-09
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 12:53:42 PM
Creation date
5/5/2025 12:53:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/23/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />P23-0480 and TR8680 Planning Commission April 23, 2025 <br />Page 7 of 31 <br />Ordinance. The materials and colors of any new enclosures shall be in compliance with <br />the Project plans to help ensure compatibility with the primary building on site and the <br />gates shall be metal or solid wood unless otherwise approved by the Director of <br />Community Development. Elevation drawings and plan details, including color and <br />material of the enclosures noted, shall be included in the building permit submittal and <br />shall be subject to the review and approval of the Director of Community Development <br />prior to building permit issuance. <br /> <br />30. RECYCLING AND COMPOSTING PROGRAMS: The Project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br /> <br />Green Building and Sustainability Measures <br /> <br />31. CLIMATE ACTION PLAN 2.0 COMPLIANCE: Prior to building permit issuance for the <br />first residential building, a GHG Emission Compliance Checklist shall be provided in <br />compliance with CAP 2.0 adopted by the City Council to the Planning Division for review <br />and approval by the Director of Community Development. The measures shall be shown <br />on the building permit plans submitted to the Building and Safety Division. The Checklist <br />shall include notation indicating the sheet(s) the measure can be found. Prior to the <br />relevant building permit final, all of the relevant measures indicated on the approved <br />checklist shall be inspected and approved by the City of Pleasanton. <br /> <br />Construction Practices and Noticing <br /> <br />32. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Friday. No construction shall be allowed on State or <br />Federal Holidays or Saturdays or Sundays. The Director of Community Development <br />may allow earlier “start times” or later “stop times” for specific construction activities, e.g., <br />concrete pouring. All construction equipment shall meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. Prior to construction, <br />the hours of construction shall be posted on site. <br /> <br />33. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br />vehicles are not allowed on the construction site except when needed as sleeping <br />quarters for a security guard subject to receipt of a temporary conditional use permit (per <br />PMC 18.116.010.E). <br /> <br />34. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the <br />Project site for daily administration/coordination purposes during the construction period. <br /> <br />35. CONSTRUCTION PARKING MANAGEMENT PLAN: The applicant shall prepare a <br />construction parking management plan to address construction parking demands during <br />the construction phase of the Project. The construction parking management plan shall <br />be subject to the review and approval by the City Traffic Engineer and Director of <br />Community Development prior to issuance of a grading permit or the first building permit, <br />whichever comes first. The following items shall be incorporated into the construction and <br />parking management plan: <br />Docusign Envelope ID: 2B93F64A-C49E-4C2A-BF54-785F6FDA6546
The URL can be used to link to this page
Your browser does not support the video tag.