My WebLink
|
Help
|
About
|
Sign Out
SR 05:007
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2004 8:43:58 AM
Creation date
12/22/2004 3:18:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/4/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. <br /> <br />All structures covered by this approval shall be constructed to meet Title 24 state energy <br />requirements. <br /> <br />26. <br /> <br />All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />27. <br /> <br />All retaining walls higher than four-feet from the top of the wall to the bottom of the <br />footway shall be constructed of reinforced concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall plans. <br /> <br />28. <br /> <br />If required by the Building Official, the project developer shall submit two copies of the <br />site soils report to the Director of Building Inspection for third party peer review and <br />shall pay for such review at the time specified by the Director, but in all cases before the <br />issuance of a grading permit. <br /> <br />29. <br /> <br />All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. <br /> <br />30. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />31. <br /> <br />Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />32. <br /> <br />The project developer shall meet all requirements of the Pleasanton Fire Code <br />(Pleasanton Municipal Code, Chapter 20.24). <br /> <br />33. <br /> <br />The project developer shall keep the site free of fire hazards from the start of lumber <br />construction until the final inspection. <br /> <br />34. <br /> <br />Prior to any construction framing, the project developer shall provide adequate fire <br />protection facilities, including, but not limited to a water supply and water flow in <br />conformance to the City's Fire Department Standards, able to suppress a major fire. <br /> <br />35. <br /> <br />Before final occupancy of the house covered by this approval, the subject property shall <br />be connected to the public sanitary sewer line and water service located in Vineyard <br /> <br />Avenue. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />Services. <br /> <br />Case No. PUD-40 <br /> <br /> Planning Commission <br />Page - ! 5 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.