Laserfiche WebLink
8. This PUD development plan shall be subject to the following site development standards, <br /> as specified in the Vineyard Avenue Corridor Specific Plan: <br /> <br />Minimum Lot Size <br /> <br />1.675 acre <br /> <br />Minimum Yard Areas: <br />Front: 30 feet <br /> Sides: 15 ft. interior; 20 ft. street <br />Rear: 30 ft. <br />Floor Area Ratio 30 % <br />Maximum Height 22 feet; one-story <br /> <br />10. <br /> <br />11. <br /> <br />Site Development Restrictions: <br /> <br />a) <br /> <br />b) <br /> <br />c) <br /> <br />d) <br /> <br />Construction shall be limited to the flat areas of the plan shown on the approved <br />PUD development plan grading plan. No accessory structures (Class I and Class <br />II), excluding open fencing, shall be permitted on the sloped areas surrounding the <br />building envelope area. <br />The height measurement for structures shall be taken from the lowest point to the <br />highest point of the structure. <br />No second story addition is permitted on the subject site. The rear elevation of the <br />building shall remain as a one-story structure (22 feet maximum height). <br />All fencing on the lot shall be limited to an open-style corral fencing. Wire mesh <br />may be added to the fence for access control. <br /> <br />The development standards for open structures, e.g., patios, arbors, porte cocheres, etc., <br />would be those outlined under Section 18.84.120, Projections Into Yards, of the <br />Pleasanton Municipal Code. All fencing and Class II accessory structures shall adhere to <br />the setbacks for the R-1-20,000 zoning district as specified in Section 18.84 of the <br />Pleasanton Municipal Code. All accessory structures or additions over 10 feet in height <br />shall be subject to the City's Administrative Design Review process. <br /> <br />The height of the primary structure shall be surveyed and verified as being in <br />conformance to the approved building height as shown on Exhibit "A" or as otherwise <br />conditioned. Said verification is the project developer's responsibility, shall be performed <br />by a licensed land surveyor or civil engineer, and shall be completed and provided to the <br />Planning Department before the first framing or structural inspection by the Building <br />Department. <br /> <br />A list of the green building measures used in the design of the addition/remodeling of the <br />home covered by this approval shall be provided for the review and approval of the <br /> <br />Case No. PUD-40 <br /> <br /> Planning Commission <br />Page- 12 - <br /> <br /> <br />