My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
040825
>
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:04:47 PM
Creation date
4/8/2025 1:04:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/8/2025
DESTRUCT DATE
20Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br />support were submitted, totaling $53.4 million. The estimated existing general fund and <br />developer impact funds resources plus various available transportation and grants funds over <br />the five-year CIP period is $40.0 million, including $2.4 million from recommended projects to <br />defund. The funding is comprised of: $15.5 million in General Fund contributions, $8.2 million <br />in general and park general CIP funds, $3.7 million in developer impact funds plus an <br />additional $1 million of anticipated revenue, $4.0 million of anticipated earned interest income <br />and $7.6 million in various available transportation funds and grants. <br /> <br />General Fund Contributions <br />Contributions from the General Fund are essential to ensure sufficient funding for certain <br />critical infrastructure needs – particularly those that are not funded by enterprise or other <br />restricted funding sources. Unfortunately, due to limited funds, the City has not been allocating <br />adequate General Fund support to the CIP or R&R needs for many years. This will need to <br />change to ensure that the City’s infrastructure, including parks and facilities, are properly <br />maintained. <br /> <br />The ten-year financial forecast, which was presented to the City Council at its March 4, 2025, <br />meeting, assumed a CIP General Fund contribution of $3.0 million in FY 2025/26 and <br />increasing that annual contribution by $0.25 million each year to reach $4.0 million in FY <br />2029/30, for a cumulative total of $17.5 million. <br /> <br />However, it should be noted that $2.0 million of the recommended $3.0 million General Fund <br />contribution for FY 2025/26 will now be going to R&R in the Facilities Renovation Fund to <br />address certain critical maintenance needs, with the remaining $1.0 million going to the <br />Miscellaneous CIP – General Fund, resulting in an updated five-year total of $15.5 million. <br /> <br />Critical needs supported by the the $2.0 million allocation will address deferred maintenance <br />for the Dolores Bengtson Aquatic Center, Fire Station 2, and Bernal Synthetic Fields, as <br />discussed below. Funds will be held in the Facilities Renovation Fund, where resources are <br />generally used for building and facility-related maintenance, and funds will be distributed to <br />these three projects when the specific scopes and amounts have been determined. The <br />anticipated five-year total contribution and other available resources remain insufficient to <br />cover the $53.4 million in requested projects, meaning only the highest-priority projects (above <br />the funding threshold) can be funded. When the AMP is completed later this year, the target <br />number will increase, which will result in a much higher unfunded amount. Removing or re- <br />allocating any additional General Funds from the available "pot" will severely impede the City's <br />ability to undertake essential projects, leading to the deterioration of community assets, <br />declining use, and increased future costs due to lack of proper repair and maintenance. <br /> <br />Program Reserves and Future Funding Strategy <br />In addition to the funds described above, the City maintains a General Fund CIP Reserve to <br />address unforeseen emergencies and failures. The City’s General Fund CIP reserve is $1.2 <br />million, which is inadequate to address these types of needs. <br /> <br />Over the past two years, the City has canceled, defunded and reassigned $26.4 million in <br />General Fund-dependent projects to address more urgent needs. In this cycle, staff is <br />recommending an additional $2.4 million in deferrals because there are insufficient funds to <br />meet ongoing operation and maintenance needs. Fully committing all available funds now will <br />limit the ability to address future needs and will necessitate reprioritization when the AMP is <br />Page 33 of 40
The URL can be used to link to this page
Your browser does not support the video tag.