Laserfiche WebLink
Ordinance No. 2290 <br /> Page 18 of 34 <br /> sewage ejector system with a backflow prevention device to assure no sewage backups <br /> in the basements. Project Specific Condition. <br /> 57. CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted on a <br /> plan sheet(s) in the submitted plans for construction. <br /> 58. DESIGN PER CITY STANDARDS: All public improvements shall be designed in <br /> conformance with the City of Pleasanton Municipal Code and the City's adopted <br /> Standard Specifications and Details in effect at the time of issuance of the <br /> permit(s). Said standards are available for download at: <br /> http://www.cityofpleasantonca.gov/gov/depts/engineering/standard.asp <br /> 59. ENGINEERING DEPARTMENT FEES FOR SERVICE: The Engineering <br /> Department assesses fees for services including plan-check, permit issuance, and <br /> inspection according to the City's adopted Master Fee Schedule. These fees are <br /> separate and distinct from fees assessed by the Community Development <br /> Department (including Planning and Building Division fees). The applicant is <br /> responsible for payment of all Engineering Department fees prior to services rendered <br /> or permit issuance, whichever is first. <br /> 60. CITY ENGINEER SIGNATURE BLOCK: The following signature block shall be <br /> depicted on the first sheet of the plans submitted for construction: "Approval of these <br /> plans is for work within the street right-of-way and public utility systems within Public <br /> Services Easements unless otherwise noted. Approval of these plans does not release <br /> the developer of the responsibility for the correction of mistakes, errors, or omissions <br /> contained therein. If during the course of construction of the improvements public <br /> interest requires a modification or a departure from the specification and details of the <br /> City of Pleasanton or these plans,the City Engineer shall have the authority to require <br /> such modification or departure and to specify the manner in which same is to be made. <br /> Approved as to design only based upon information submitted hereon this [DAY] of <br /> [MONTH], [YEAR]. Adam Nelkie, P.E., City Engineer, [DATE]" (Address this condition <br /> prior to map plan approval). <br /> 61. CLEAN WATER PROGRAM (LARGE PROJECTS): Because the project creates <br /> and/or replaces more than 10,000 square feet(0.23 acres)of impervious surface, it is <br /> considered a Regulated Project according to Provision C.3.b of the Municipal <br /> Regional Stormwater NPDES Permit that regulates stormwater runoff in Alameda <br /> County. The Alameda Countywide Clean Water Program developed a C.3 Guidance <br /> Manual to assist applicants in addressing these regulations. The Guidance Manual is <br /> available for download at: <br /> https://www.cleanwaterproqram.orq/businesses/development.html. <br /> Regulated projects must include stormwater treatment measures in the site design to <br /> remove pollutants from stormwater upstream of any connection to the City's or <br /> Alameda County's stormwater conveyance networks. In addition, regulated projects <br /> must be subject to a Stormwater Treatment Measure Maintenance Agreement <br /> between the City and property owner to assure long-term maintenance of the installed <br /> measures. The City's Engineering Department will provide a <br />