My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
020425
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:34:30 PM
Creation date
1/31/2025 2:19:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2025
DESTRUCT DATE
20Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2290 <br />Page 3 of 34 <br /> <br />buildings have been sited to minimize impacts on surrounding neighbors to the extent feasible <br />and have been designed to reduce their perceived mass. New landscaping would be installed <br />throughout the site to enhance off-site views and the PUD development plan is compatible with <br />the previously developed properties in the area and downtown. The project would include <br />construction of residences towards the northern portion of the project, near the undevelopable <br />area of the project site. The proposed lots adjacent to the undevelopable area would be set back <br />20 feet from the top of the existing bank and there would be no modifications to the bed, bank, or <br />the Arroyo del Valle as a result of this development. <br /> <br />4. Whether grading takes into account environmental characteristics and is <br />designed in keeping with the best engineering practices to avoid erosion, slides, or <br />flooding to have as minimal an effect upon the environment as possible. <br /> <br />There is a gradual slope to the south and a relatively steep downward slope leading to <br />the Arroyo del Valle Stream bed to the north. Grading is proposed in areas on the relatively flat <br />portion of the site to maintain residential structure heights similar to adjacent residential properties <br />when creating flat pad lots, in addition to grading for bio-retention areas, a parking lot, and the <br />hammerhead street. Grading for building pads is expected to reach six and a half feet below the <br />surface and excavations for utility lines and stormwater infrastructure would reach as much as <br />nine feet below the surface. Grading would likely result in approximately 4,200 cubic yards of <br />material being exported from the site. The Arroyo del Valle stream is north of the project site. <br />Development would not include modifications to the bed, bank or channel of Arroyo del Valle. <br /> <br />Erosion control and dust suppression measures would be documented in the building <br />and improvement plans and will be administered by the City’s Building and Engineering Divisions. <br />City building code requirements would ensure that building foundations, on-site driveways, and <br />parking areas are constructed on properly prepared surfaces. The proposed development would <br />provide adequate drainage to prevent flooding. Parking lot and roof drainage would drain into <br />landscaped bioretention areas that would filter contaminants before entering the arroyo and, <br />ultimately, the bay. The proposed project site is not located within an Alquist-Priolo Earthquake <br />Fault Zone. A portion of the project site is within a designated flood zone, the northern area <br />adjacent to Arroyo del Valle, though as conditioned, development would ensure conservation of <br />the Arroyo Del Valle through design and best management practices. There is no proposed <br />development or grading within 20 feet of the top of a watercourse bank, which would minimize <br />risks associated with flood hazards and redirection of flood flows. <br /> <br />5. Whether streets and buildings have been designed and located to <br />complement the natural terrain and landscape: <br /> <br />The Property is in a developed area of the City and would not involve the extension of <br />any new public streets (the new street is private). The new development would be located on the <br />more level areas of the proposed project site, and as described in Finding 3, the grading has been <br />designed to integrate the development into the terrain. The proposed residences would be <br />compatible in size and scale with surrounding structures. New landscaping including large box- <br />sized trees would be installed to mitigate the loss of the existing landscaping and trees. <br /> <br />6. Whether adequate public safety measures have been incorporated into the <br />design of the plan: <br /> <br />The public improvements associated with the Project would be consistent with City <br />design standards. The existing driveway entrance is located and configured to provide adequate <br />line-of-sight viewing distance for vehicles and to facilitate efficient ingress/egress to and from the <br />Page 18 of 350
The URL can be used to link to this page
Your browser does not support the video tag.