Laserfiche WebLink
RESOLUTION NO. 2024-077 <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON <br /> APPROVING AND ADOPTING THE NEXUS STUDIES PREPARED BY ECONOMIC <br /> AND PLANNING SYSTEMS, INC., DATED NOVEMBER 25, 2024, AND BY RAFTELIS, <br /> DATED OCTOBER 17, 2024; AND AMENDING THE MASTER FEE SCHEDULE TO <br /> UPDATE THE EXISTING CAPITAL FACILITY, TRANSPORTATION DEVELOPMENT, <br /> AFFORDABLE HOUSING, AND SEWER AND WATER CONNECTION FEES <br /> WHEREAS, Chapters 3.22, 3.26 and 17.40 of the Pleasanton Municipal Code <br /> respectively established the Capital Facilities, Transportation Development and Affordable <br /> Housing Fees; and Chapters 14.04 and 15.05 of the Pleasanton Municipal Code respectively <br /> establish the charges for connection to the City's water and sewer systems; and <br /> WHEREAS, these various chapters provide that such fees and charges shall be adopted <br /> by resolution of the City Council; and <br /> WHEREAS, Assembly Bill No. 602, signed into law on September 28, 2021, and <br /> effective January 1, 2022, requires that a local agency that conducts an impact fee nexus study <br /> after January 1, 2022, must comply with new standards and practices, including, but not limited <br /> to, calculating fees levied or imposed on a housing development project to be proportionate to <br /> the square footage of proposed units, but with such requirement not applicable to sewer and <br /> water connection fees; and <br /> WHEREAS, the City has undertaken a comprehensive review of the Capital Facility, <br /> Transportation Development, and Affordable Housing Fee, with the latter inclusive of fees for <br /> commercial development (referred to as the Commercial Linkage Fee) and residential <br /> development (referred to as the Affordable Housing In-Lieu Fee), to reflect the improvements <br /> described in the 2005-2025 General Plan, the most recent 5-Year Capital Improvement <br /> Program, and Pleasanton Development Impact Fee Long-Term Capital Improvement Program <br /> that in part form a basis for such fees as detailed in the Fee Update and Nexus Study for the <br /> City of Pleasanton Development Impact Fee, Commercial Linkage Fee, and Affordable Housing <br /> In-Lieu Fee prepared by Economic and Planning Systems (EPS) dated November 25, 2024, <br /> attached hereto as Exhibit A, and incorporated by this reference and adopts the findings <br /> contained therein. The Development Impact Fee Study shall be made available for public <br /> inspection within the office of the City Clerk, and on the City's website within 30 days of <br /> adoption and <br /> WHEREAS, the City has undertaken a comprehensive review of the charges for <br /> connection to the water and sewer system (referred to as the water and sewer connection fees), <br /> to reflect the improvements described in the Water Distribution System Capacity Master Plan <br /> and incremental wastewater system improvements that in part form a basis for such fees or <br /> charges as detailed in the City of Pleasanton Water and Wastewater Connection Fee Study <br /> prepared by Raftelis dated October 17, 2024 that results in changes to the fees charged, <br /> attached hereto as Exhibit B, and incorporated by this reference; and <br /> WHEREAS, the City Council held four public workshops to consider the results of the <br /> above-referenced studies and related amendments to the inclusionary zoning ordinance on May <br /> 7, 2024 and August 20, 2024, October 15, and November 19, 2024, including considerations of <br />