Laserfiche WebLink
<br />6. The $900M 10-year state of good repair gap – Can you refresh my memory, did that <br />include replacing the Civic Center? If so, how much was that cost estimated at? <br />Replacement of the Civic Center is not included in the draft 10-year infrastructure <br />plan. <br />