Laserfiche WebLink
<br /> <br /> <br />P24-0370 PC-2024-18, December 11, 2024 <br />Page 4 of 4 <br />improvement projects throughout the tri-valley area. Per the narrative provided in <br />submittal 2, the project will generate an average of 20 trips during the peak hours <br />(24 AM trips + 16 PM trips / 2). (Project Specific Condition) <br /> <br />16. Monitoring of circulation and parking during operational hours may be conducted by <br />Traffic Engineering staff. If parking exceeds the allowed allotment and/or circulation <br />problems arise once the programs are in operation, as determined by the City’s Traffic <br />Engineer, this conditional use permit may be submitted to the Planning Commission for <br />their subsequent review at a public hearing. If necessary, the Planning Commission <br />may modify or add conditions of approval to mitigate such impacts or may revoke said <br />minor conditional use permit.