Laserfiche WebLink
Page 9 of 9 <br /> <br />The evaluation results and recommendations shall be documented in a technical memorandum <br />(TM). Akel shall provide a draft TM for City review and comment. Akel shall incorporate City <br />comments into a final TM. <br />Schedule <br />The following summarizes the general sequencing and schedule milestones for the scope of <br />work: <br />• Zone 7 Transmission System Workshop (Task 3) – December 2024 <br />• Zone 7 and City Joint Wells Alternative Evaluation (Task 2) – February 2025 <br />• New City Wells Alternative Evaluation (Task 1) – April 2025 <br />o Note: City anticipates field testing to determine preferred well locations / capacities to <br />be complete by March 2025 <br />• Preliminary Results Workshop (Task 4) – May 2025 <br />• Technical Memorandum (Task 5) – June 2025 <br /> <br /> <br />Docusign Envelope ID: E67CB798-34D0-4A4E-BFB8-E9718C48E0D9