My WebLink
|
Help
|
About
|
Sign Out
DANVILLE BREWING
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
D
>
DANVILLE BREWING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 2:16:16 PM
Creation date
11/20/2024 12:21:10 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
DANVILLE BREWING
Contract Record Series
704-05
Contract Expiration
6/30/2025
NOTES
REIMBURSEMENT AGREEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal for 3595 Utah Street TIS (City of Pleasanton, California) October 07, 2024 <br />4 <br />Task 3.4 – Other Components <br />TJKM will review the proposed site plan for on-site circulation (including pedestrian/bicycle access) and the driveway configuration (notably, operations, configuration, and sight distance). TJKM will note any potential issues and will make recommendations on a necessary basis. <br />We will perform site observations as necessary. TJKM will note any potential issues and will make recommendations on a necessary basis. <br />The proposed parking supply will be compared to the City’s standards. We will make recommendations on a necessary basis. <br />TASK 4 – DRAFT AND FINAL REPORT <br />TJKM will prepare a draft TIS report consistent with the City of Pleasanton standards that summarizes analysis findings and recommendations for City review and feedback. TJKM assumes one round of City review comments for all reports. TJKM will prepare final TIA report incorporating all comments received <br />from the City staff. <br />INITIAL FEE AND SCHEDULE <br />Based on our estimated level of effort for the above Scope of Work, the not-to-exceed cost is $14,141.00 <br />TJKM will bill on a time and materials basis. Table 1 below illustrates the cost breakdown for the project. <br />Table 1 – Level of Effort <br />Tasks Description Cost <br />1 Project Management, Administration & Meetings $ 1,176.00 2 Data Needs $ 960.00 3 Traffic Operations Analysis <br />3.1 Trip Generation, Distribution and Assignment $ 1,785.00 3.2 Intersection Analysis $ 2,541.00 <br />3.3 Mitigation Measures $ 1,869.00 3.4 Other Components $ 2,058.00 <br />4 Draft and Final Report $ 3,752.00 <br />Total $ 14,141.00 <br />We anticipate delivering a draft report within four to six weeks after notice-to-proceed, finalizing the scope of work and analysis parameters with City staff. TJKM will provide the data needs/request form to the City <br />within 3 business days of proposal approval/authorization to proceed. <br />Although this scope of work has been defined specifically for this project, it is possible that changes may need to be made to the scope in the future. Any items not expressly mentioned in the above scope will be <br />considered extra services and will be billed at our standard billing rates. Typical extra service items include: additional intersection counts, additional fieldwork, changes to the project proposal land use mix, project meetings, and attendance at any public hearings not specified in this scope of work. Extra services will not proceed without prior authorization. <br /> <br /> <br />Docusign Envelope ID: 1EECB64E-AFF1-4EE7-8C41-1F5F27A4E512Docusign Envelope ID: CD7ED82D-657A-4CBE-94EA-9FF5CDA7D9D5
The URL can be used to link to this page
Your browser does not support the video tag.