My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
101524 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 3:54:45 PM
Creation date
10/10/2024 3:53:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 6 <br />proposed project is outside the limits of the current phase of design and construction for <br />corridor improvements for the West Las Positas Boulevard Multimodal Reconstruction Project <br />(Hopyard Road to Stoneridge Drive). <br /> <br />Design FY 25/26 FY 26/27 <br />2026 ACTC CIP Request $750,000 - <br />Local Match - Future Funding <br />(subject to Council approval) <br />$250,000 - <br />Construction FY 25/26 FY 26/27 <br />2026 ACTC CIP Request - $1,250,000 <br />Local Match - Future Funding <br />(subject to Council approval) <br />- $3,750,000 <br />Total $1,000,000 (Design) $5,000,000 (Construction) <br /> <br />Project 2: I-580 Overcrossing Bicycle and Pedestrian Improvements Project, CIP No. <br />22570 <br />The total project cost for design and construction of the I-580 Overcrossing Bicycle and <br />Pedestrian Improvements Project is $2,500,000. <br /> <br />Design FY 25/26 FY 26/27 <br />2026 ACTC CIP Request $525,000 - <br />Local Match - Existing TDA <br />Article III <br />$175,000 - <br />Construction FY 25/26 FY 26/27 <br />2026 ACTC CIP Request - $1,350,000 <br />Local Match - Existing <br />Highway Safety Improvement <br />Program Grant <br />- $250,000 <br />Local Match - Future Funding <br />(subject to Council approval) <br />- $200,000 <br />Total $700,000 (Design) $1,800,000 (Construction) <br /> <br />Project 3: Santa Rita Road at Valley Avenue Intersection Improvement Project, CIP No. <br />20569 <br />The total project cost for design and construction of the Santa Rita Road at Valley Avenue <br />Intersection Improvements Project is $5,100,000. <br /> <br />Design FY 25/26 FY 26/27 <br />Page 48 of 218
The URL can be used to link to this page
Your browser does not support the video tag.