My WebLink
|
Help
|
About
|
Sign Out
Library Commission Agenda Packet 10032024
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
LIBRARY
>
2024
>
10032024
>
Library Commission Agenda Packet 10032024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 4:21:39 PM
Creation date
9/30/2024 4:19:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />VI. LIVERMORE PLEASANTON FIRE DEPARTMENT Eff 01.01.2024 <br />D. Miscellaneous Fees <br />1 Candles and Open Flame in Assembly, per event $222 <br />2 Carnivals and Fairs, per event $416 <br />3 Exhibits and Trade Shows, per event $652 <br />4 Pyrotechnical Special Effects show, per show $1,678 <br />5 Temporary Membrane Structures, per event $264 <br />6 Seasonal Lots (Xmas, Pumpkin, etc.), each lot $264 <br />7 Open Burning, each application $180 <br />8 Alternate Means or Method Application, each $222 <br />9 Hydrant Flow Test, per area tested $430 <br />10 Incident Reports, each $7 <br />11 Licensed Care Facilities- Pre-Fire Clearance (other than Single-Family Home <br />Residential Care), each $458 <br />12 Dump Houses, each $1,498 <br />13 Excessive False Alarms, each occurrence* $541 <br />14 Outside Plan Checker, per hour $173 <br />15 Underground Storage Tanks removal, per hour $207 <br />16 UST - Tank top, monitoring system etc., per hour $207 <br />17 Other Plan Checks and Inspections (Emergency repair/modification to fire <br />protection systems), per hour $207 <br />18 Off hours inspections, per hour (3-hour minimum charge), per request $207 <br />19 Asbestos abatement, per hour $207 <br />20 Compressed Gas System High Hazard, per hour $207 <br />21 Compressed Gas System High Hazard - additional for projects with more than one <br />system, per hour $207 <br />22 High- Rise (charge on hourly), per hour $207 <br />23 Fire Alarm Monitoring Equipment change/replacement, per hour $207 <br />24 Fire code assessment/approval change of occupancy/use/equipment/ access, per <br />application $257 <br />25 Service Required in Excess of Standard (due to size, occupancy uses or other than <br />local regulations), per hour $207 <br />26 Fire Monitoring System Only (Water flow, associated equipment, Central Station), <br />per system $485 <br />* Excessive False Alarm is defined as three or more false alarms within a 90-day <br />period <br />VI. Fire: 25 of 52 <br />Page 54 of 102
The URL can be used to link to this page
Your browser does not support the video tag.