My WebLink
|
Help
|
About
|
Sign Out
Library Commission Agenda Packet 10032024
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
LIBRARY
>
2024
>
10032024
>
Library Commission Agenda Packet 10032024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 4:21:39 PM
Creation date
9/30/2024 4:19:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />VI. LIVERMORE PLEASANTON FIRE DEPARTMENT Eff 01.01.2024 <br />13 Fire Alarm System: <br />a Up to 15 Initiation devices $957 <br />b 16 - 50 Initiation devices $1,207 <br />c 51 - 100 Initiation devices $1,540 <br />d 101 - 1000 Initiation devices $1,706 <br />e For each group of 50 additional devices over 1,000 $277 <br />f Fire Alarm Communication Change Only $414 <br />14 New Bldg - no special uses $499 <br />15 Tl - no special uses $458 <br />16 Spray Paint Booth: <br /> Up to 2 Spray Paint Booths $1,082 <br /> Each additional Spray Paint Booth $69 <br />17 Propane Tank (LGP) $985 <br />18 Above Ground Tank Removal: <br />a 60 - 500 gallon $985 <br />b 501 - 2000 gallon $1,026 <br />c 2000 + gallon $1,179 <br />19 Compressed Gas System- non high-hazard $485 <br />20 a Medical Gas- Level 1(lg) $2,053 <br />b Medical Gas- Level 3 $624 <br />21 Cryogenic Tank $485 <br />22 Emergency Generator w/ Fuel Tank $485 <br />23 Propane Exchange Rack $277 <br />24 Vehicle Access Gate, not part of a building $264 <br />25 Refrigerant System, each $749 <br />26 High-Piled storage of combustibles: <br />a Class I-IV 2,500 sq ft - 12,000 sq. ft. $485 <br />b Class I-IV 12,001 sq ft - 500,000 sq ft $805 <br />c High Hazard $1,124 <br />27 Smoke Control System $1,803 <br />28 SPAs, CUP, PUD $444 <br />29 Each site inspection, after twice failed same inspection $638 <br />30 Underground Storage Tank (UST) Installation: <br />a Up to 2 tanks $2,913 <br />b Each additional tank $277 <br />VI. Fire: 24 of 52 <br />Page 53 of 102
The URL can be used to link to this page
Your browser does not support the video tag.