My WebLink
|
Help
|
About
|
Sign Out
Parks and Recreation Commission Agenda Packet 091224
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2024
>
09122024
>
Parks and Recreation Commission Agenda Packet 091224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 10:02:40 AM
Creation date
9/27/2024 10:01:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />III. ENGINEERING DIVISION Eff 01.01.2024 <br />Professional Consultant Expense Consultant cost +25% <br />Up to 100,000 cubic yards see IV Building Section E <br />D. Construction Services Inspection <br />Due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever occurs first <br />see IV Building Section E <br />Construction Inspection- City-Inspected improvements <br />Valuation under $5,000 10% of valuation- $167 minimum <br />Valuation $5,000 to $20,000 $499 <br />Plus 3.83 % of valuation over $5,000 <br />Valuation over $20,000 $1,265 <br />Plus 5.55 % of valuation over $20,000 <br />Specialized Inspections Consultant cost +25% <br />Overtime Inspection (2 hour minimum charge)Cost+ Overhead <br />E. Assessment Districts <br />City Engineering Department Administration <br /> During formation, design, and construction Cost + Overhead <br />Inspection <br />Minimum charge is 4% of costs to construct public improvements See Construction Inspec. Fee <br />Segregation of Assessments <br />Fee per district $694 <br />All City of Pleasanton Engineering Division Fees shall be revised annually on January 1 by the percentage increase or decrease <br />in the Engineering News Record Construction Cost Index (CCI) for the San Francisco Bay Area. <br />Grading Fee <br />Grading Plan Review <br />III. Engineering: 8 of 52 <br />Page 37 of 95
The URL can be used to link to this page
Your browser does not support the video tag.