My WebLink
|
Help
|
About
|
Sign Out
Parks and Recreation Commission Agenda Packet 091224
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2024
>
09122024
>
Parks and Recreation Commission Agenda Packet 091224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 10:02:40 AM
Creation date
9/27/2024 10:01:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />III. ENGINEERING DIVISION Eff 01.01.2024 <br />A. General <br />Map Reproduction (per sheet) 5 <br />Plotted GIS Map (per sheet) 30 <br />Specialized Map/Data Request Time & Materials <br />Standard Specifications & Details (printed version)20 <br />B. Encroachment <br />Dry Utilities PMC 13.04.040 $208 <br />Other $42 <br />Inspection Fees <br />Dry Utilities Time & Materials- $167 minimum <br /> Other- Valuation under $5,000 10% of valuation- $167 minimum <br />Other- Valuation $5,000 to $20,000 $499 <br />Plus 3.83% of valuation over $5,000 <br />Other- Valuation over $20,000 $1,265 <br />Plus 5.55% of valuation over $20,000 <br />Reinspection Time & Materials - $167 minimum <br />Specialized Inspections Consultant Cost + 25% <br />One-time $16 <br />Annual $90 <br />Haul Route Permit $83 <br />*Updated annually per Caltrans (https://dot.ca.gov/programs/traffic-operations/transportation-permits) <br />C. Private Development Review <br />Base fee $3,468 <br />plus fee per lot/parcel $42 <br />Base fee $6,242 <br />plus fee per lot/parcel $42 <br />GIS Digital Compliance <br />Annexation Processing Fee $12,193 <br />Pre-Annexation Agreement Processing $6,200 <br />GHAD Formation/Annexation Fee $4,369 <br />Development Improvement Plan Check <br />Percentage of total cost of City-reviewed improvements 4.16% <br />Improvement Plan Review/Revision & Plan Check - after 4th revision $1,096 <br />Traffic Signal (commercial off-site)- Plan Check $2,774 <br />Right of Way Dedication, Vacation or Certificate of Compliance $1,914 <br />Technology Fee (GIS Mapping)- per lot/parcel $69 <br />Subdivision Joint Trench Plan Check $694 <br />Base fee $194 <br />plus fee per course correction $42 <br />Base fee $1,845 <br />plus fee per lot/parcel $55 <br />Hillside Base Fee $6,936 <br />plus fee per acre (disturbed area) $250 <br />Flatland Base Fee $4,439 <br />plus fee per acre (disturbed area) $187 <br />Parcel Map <br />Urban Lot Splits filed in accordance <br />with PMC 18.101 <br />Time & Materials or Consultant cost + 25% <br />Map Copies <br />Permit Fees <br />Final Map <br />Annexation Fees (does not include separate fees <br />paid to LAFCo - Local Agency Formation Commission of <br />Alameda County) <br />Amended Maps <br />Lot Line Adjustment or Merger <br />Erosion Control <br />(SWPPP) <br />Transportation Permit* <br />Oversize Load - Fee set per State <br />III. Engineering: 7 of 52 <br />Page 36 of 95
The URL can be used to link to this page
Your browser does not support the video tag.