ESTIMATE SUMMARY <br />PROJECT:Amador Theater Seismic Assessment DATE:4/25/2022 <br />LEVEL:DRAFT Conceptual ESTIMATOR:Javier Silva <br />CLIENT:Interactive Resources SCHEDULE:12 Months <br />LOCATION:Pleasanton, CA AREA (SF):15,900 <br />ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL AMOUNT <br />1 Remodel 14,500 sf <br />Structural Work <br />Fiber wrap columns 1,920 sf 31.25 60,000 <br />Upgrade diaphragm chords/ties along bottom of trusses 390 lf 320.51 125,000 <br />Upgrade roof diaphragm over main seating and stage, <br />5/8" struct 1 plywood w/nails at 3" o.c. at edges 5,117 sf 8.64 44,195 <br />Steel brace frames 155 lf 4,032.26 625,000 <br />Foundations for brace frames 155 lf 987.06 152,995 <br />Demo and reconstruct mech/elect room due to <br />settlement issues 200 sf 625.00 125,000 <br />Provide new stairs each side to balcony, incl. modify wall <br />and foundations for u/g utilities 2 ea 88,342.30 176,685 <br />Miscellaneous structural work - Lobby 594 sf 312.50 185,625 <br />Miscellaneous structural work - Scene Shop 1,181 sf 312.50 369,063 <br />Reconfigure loading dock to create angle 410 sf 250.00 102,500 <br />Provide upgraded connections between steel roof <br />trusses and concrete walls 22 ea 1,250.00 27,500 <br />Reinforce foundation at south side 150 lf 365.58 54,837 <br />Miscellaneous structural work - Loft 160 sf 312.50 50,000 <br />Miscellaneous structural work - Office 210 sf 312.50 65,625 <br />Miscellaneous structural work - Balcony 210 sf 312.50 65,625 <br />Collector ties at balcony 146 lf 320.51 46,795 <br />Provide upgraded connections between steel roof <br />trusses and concrete walls - balcony level 7 ea 1,250.00 8,750 <br />Diagonal bracing at balcony 335 lf 123.38 41,333 <br />Architectural, New <br />New green room and associated restroom 878 sf 875.00 768,250 <br />Elevator, shaft and pit, complete 1 ea 414,567.24 414,567 <br />Construct corridor through existing shop for acessible hall <br />to stage 200 sf 625.00 125,000 <br />Construct single restroom, complete 64 sf 1,250.00 80,000 <br />Construct family restroom, complete 64 sf 1,250.00 80,000 <br />Construct kitchen, complete 138 sf 1,875.00 258,750 <br />Construct ticket office 100 sf 625.00 62,500 <br />Expand lobby 594 sf 1,062.50 631,125 <br />Exterior exit steel stairs 1 flt 86,368.17 86,368 <br />Architectural, Rehab <br />Rework all entry doors on west side 6 ea 8,636.82 51,821 <br />All new hardware at 80% of existing doors 25 ea 1,850.75 46,269 <br />Repair/rehab exterior dental molding 30 lf 246.77 7,403 <br />New railing at lobby stairs 1 ls 31,250.00 31,250 <br />Lighting for seating area 3,173 sf 25.00 79,325 <br />Lit seat numbers 1 ls 33,750.00 33,750 <br />Rehab flooring 15,900 sf 31.25 496,875 <br />Rehab ceilings 15,900 sf 31.25 496,875 <br />Rehab electrical 15,900 sf 50.00 795,000 <br />Rehab mechanical 15,900 sf 62.50 993,750 <br />Stage rigging, curtain, equipment 1 ls 625,000.00 625,000 <br />SILVA COST CONSULTING, INC.8 of 9 <br />Page 75 of 454