Laserfiche WebLink
12 <br />cabinets. Street lighting plans will be prepared on 40-scale sheets; we estimated three (3) street lighting <br />plans for this segment. <br />Segment V – Hacienda Drive to Stoneridge Drive <br />Fehr & Peers will provide Plans, Specifications and Cost Estimates for traffic signal improvements in Segment V <br />at the following intersections: <br />• Stoneridge Drive/West Las Positas Boulevard <br />• Street Lighting about 3,100 feet <br />Traffic signal plans will be prepared on 20-scale sheets; we estimated four (4) traffic signal plans will be <br />needed for this segment. These traffic signal plans will show the locations of poles, equipment, and <br />cabinets. Street lighting plans will be prepared on 40-scale sheets; we estimated four (4) street lighting <br />plans for this segment. <br />Submittal and Design Coordination <br />The traffic signal and street lighting PS&E for each segment identified above will be submitted at the 65%, 95%, <br />100% (pre-final), and Final (Bid Set) design levels and will be reviewed by the City of Pleasanton. Comments will <br />be addressed and incorporated into subsequent submittals. An engineers estimate and specifications will be <br />provided at 65%, 95%, 100%, and Bid Set design levels. This scope assumes we will receive one set of <br />consolidated comments from the City at each review level. <br />Task 6.6. Draft and Final Storm Water Management Plan <br />Mark Thomas will prepare a Storm Water Control Plan in accordance with the City of Pleasanton Stormwater <br />Permit requirements including a Storm Water Control Plan Checklist, Storm Water Requirements Checklist, <br />Storm Water Management Plan (SMP), and Clean Bay Blueprint. The project is anticipated to require Provision <br />C.3 Numerically Sized Treatment Requirements to size C.3 planters for reconstructed roadway pavement areas. <br />C.3 planters are not required for bicycle and pedestrian facilities built within the existing paved roadway as they <br />will direct stormwater runoff to adjacent vegetated areas. As such, preparation of sizing worksheets, special <br />project worksheets, hydromodification calculations and flow duration controls are not included in this scope of <br />services. A water pollution control plan showing the types and locations for BMPs during construction and <br />permanent erosion control measures, including slope restorations measures, will be included in the final project <br />plans. <br />Task 6.7. Draft and Final SWPPP <br />Mark Thomas’ Qualified Storm Water Pollution Prevention Plan (SWPPP) Developer (QSD) will prepare a design <br />phase Conceptual SWPPP (CSWPPP) in compliance with the statewide National Pollutant Discharge Elimination <br />System (NPDES) CGP, Order No. 2009-0009-DWQ, most recently updated by Order No. 2012-0006-DWQ. <br />The CSWPPP will comply with City standards and any Project-specific requirements from the RWQCB. Mark <br />Thomas will use the SWPPP template and guidance developed by the California Stormwater Quality Association. <br />The CSWPPP will include the evaluation and documentation of the risk assessment as presented in the <br />CGP. Mark Thomas will identify potential temporary water quality and erosion impacts of the Project and <br />propose appropriate temporary construction site and erosion control BMP measures. These BMP <br />measures will be identified on the Water Pollution Control (WPC) Plans included in the CSWPPP. Permit <br />Registration Documents (PRD’s) will be prepared including the Notice of Intent (NOI), a risk assessment, <br />post-construction calculations, a site map, a SWPPP, a signed certificate, and the first annual permit fee to <br />be paid by the City. Mark Thomas will coordinate with the City for review and approval. <br />The CSWPPP will be based on design-level information to be used for reference purposes only and will not <br />be a construction document. Mark Thomas assumes no QSD or Qualified SWPPP Practitioner role during <br />construction and that the selected Contractor’s QSD will be required to develop an independent SWPPP <br />for approval by the City and uploaded to the State Water Resources Control Board’s Stormwater Multiple <br />Applications and Report Tracking System (SMARTS). <br />Docusign Envelope ID: CFB4D269-E371-4DA6-B769-59DDBD4C7856Docusign Envelope ID: B363250F-E21F-4652-B170-E77C9043D4FB