My WebLink
|
Help
|
About
|
Sign Out
MARK THOMAS & COMPANY, INC. (2)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 3:29:05 PM
Creation date
7/31/2024 3:28:55 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
MARK THOMAS & COMPANY, INC.
Contract Record Series
704-05
Munis Contract #
2023416
Contract Expiration
12/31/2025
NOTES
WEST LAS POSITAS BLVD. MULTIMODAL RECONSTRUCTION PROJECT, CIP 11514
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />stakeholders, and to allow for major comments prior to investment of significant design effort in design <br />details. The 100% (pre-final) submittal will be provided as a final plan check opportunity by the City to ensure <br />prior comments have been addressed prior to bidding. Addressing new design comments provided by the City <br />after the 100% (pre-final) design package has been submitted would be provided as an additional service with <br />additional fee to be negotiated prior to the start of design revisions. <br />The approach listed below will best address the scope of improvements listed in our understanding of the project <br />and will be built upon during the preparation of intermediate design submittals by adding plan information and <br />detail sheets until a complete, buildable and biddable package is reached. This scope of work assumes a single bid <br />package will be prepared for the Phase 1 improvements. <br />Below is an estimated count of plan sheets: <br />Sheet Name Number of <br />Sheets <br />Drawing Scale <br />Title Sheet 1 Not to scale <br />Standard Abbreviations/General Notes 1 Not to scale <br />Typical Cross Sections 4 Not to scale <br />Key Map 1 500 <br />Project Control 1 500 <br />Demolition Plans 11 20 <br />Layout Plans 11 20 <br />Construction Details 24 Varies <br />Water Pollution Control 11 20 <br />Drainage and Utility Plans and Profiles 11 20 <br />Drainage and Utility Details and Lateral <br />Profiles <br />6 Varies <br />Sewer Plan and Profiles 11 20 <br />Construction Area Signs 1 200 <br />Staging / Traffic Handling/Detour Plans - - <br />Stage 1 - 3 Phases 18 40 <br />Stage 2 - 4 Phases 24 40 <br />Stage 3 - 1 Phase 6 40 <br />Pavement Delineation/Sign Plans and Details 12 20 <br />Landscape Planting Plans and Landscape <br />Construction Details <br />13 20 <br />Landscape Irrigation Plans and Details 15 20 <br />Traffic Signal Modification Plans and <br />Schedules (Fehr & Peers) <br />8 20 <br />Street Lighting Plans 10 40 <br />Total Sheets 200 <br />Task 6.1. 65% PS&E <br />The Mark Thomas team will develop plans, specifications, and estimate for 65% design and include comment- <br />responses as received from the agencies’ review of 35% design submittal. The comment-response matrix will <br />be prepared to identify, resolve, and document conflicts. It is assumed that no major geometric or other major <br />project elements will change after the 65% design. Ahead of the 65% design, Mark Thomas will attend a PDT <br />meeting with the City and other stakeholder agencies to resolve any issues from 35% design review. Mark <br />Thomas will incorporate the agreed upon comments received from the City and other agencies into the 65% <br />design. The 65% plan set will include all the sheets shown above. <br />Toole will conduct a peer review of the 65% plans for adherence to best practices in bicycle and pedestrian <br />facility design. <br />Docusign Envelope ID: CFB4D269-E371-4DA6-B769-59DDBD4C7856Docusign Envelope ID: B363250F-E21F-4652-B170-E77C9043D4FB
The URL can be used to link to this page
Your browser does not support the video tag.