Laserfiche WebLink
Page 6 of 12 <br />▪ On September 8, 2023, staff prepared the draft conceptual design for the installation of <br />columbariums (which house people's cremains) in the cemetery. <br />• On November 13, staff completed the final conceptual design and estimate for the <br />columbariums. The project is estimated to cost approximately $660,000. <br /> <br />o In February 2024, staff added additional directional signage at the cemetery to help <br />prevent visitors from driving in the wrong direction. <br />o In May, the cemetery contractor replaced the plants and flowers in the hanging flower <br />baskets <br /> <br />COURT RESURFACING <br />The city of Pleasanton annually budgets for court repair and replacement in order to maintain <br />the playability of the basketball, tennis, and pickleball courts in our city parks. During the <br />2023/24 Capital Improvement Program budgeting process, the City budgeted for the <br />replacement of the court at Fairlands Neighborhood Park and for the conversion of tennis <br />court 10 to pickleball courts and repainting courts 1 – 9 and 11 – 12 at Tennis and Community <br />Park. <br /> <br />Project status: The construction documents are out to bid. <br />▪ On August 3, 2023, staff met at Fairlands Park to confirm the extent of repair required <br />for the two tennis courts. <br />▪ In late November, staff started putting together the construction documents for the <br />repair and replacement of the courts at Tennis and Community Park and Fairland <br />Neighborhood Park. <br />▪ On December 13, staff conducted site reconnaissance at Tennis and Community Park <br />and Fairlands Neighborhood Park to confirm measurements and the accuracy of the <br />draft construction plans. <br />o On February 7, 2024, staff shot the grades at court 10 at Tennis and Community Park <br />to confirm the grading and drainage. <br />o On April 10, staff completed 90% complete construction documents and discussed the <br />project with Lifetime Tennis, the operator of the Tennis and Community Park tennis and <br />pickleball courts. <br />o On June 18, staff completed the construction documents. <br />o On June 20, staff advertised the project with a bid due date of July 11. <br /> <br />WEST LAS POSITAS <br />The city of Pleasanton identified the repair and replacement of West las Positas as a priority <br />infrastructure project along with prioritizing it as a major on-street bicycle route in the Bicycle <br />and Pedestrian Master Plan. On December 6, 2022, the City Council approved a design <br />agreement with Mark Thomas to prepare two design alternatives: Alternative 1 being a “quick <br />build” concept identifying the necessary work within the existing roadway with limited changes <br />to the existing infrastructure, and Alternative 2, an “ultimate build” concept identifying work to <br />Page 18 of 33