Laserfiche WebLink
<br /> <br /> <br /> <br />P22-1089, PUD-147, Tract 8522 PC-2024-14, June 26, 2024 <br /> <br />25 <br /> <br />56. WATER NETWORK MODELING: A site-specific analysis of the proposed water network <br />was commissioned with the City’s consultant, Akel Engineering Group. Akel’s analysis <br />offered the following recommendations: Pressures below 25 psi are expected at Lots 1, <br />2, and 3 on the west side of the project and it is recommended a parallel main be <br />constructed to connect to the 510 Pressure Zone pipeline in Foothill Road. This will <br />increase pressure to approximately 34 psi during peak hours. Pressures at lots 1, 2, 3, <br />11, and 12 will be below the criteria of 40 psi during peak hour demands. The low <br />pressures range from 34 psi (Lots 1, 2, and 3) to 39 psi (Lots 11 and 12). Individual <br />booster pumps would be required for these lots. In addition, those lots served by <br />individual booster pumps shall enter into a Maintenance Covenant, Assumption of Risk, <br />Release of Claims, and Covenant Not to Sue in a form acceptable to the City Attorney’s <br />Office in conformance with Pleasanton Municipal Code §14.04.050(E). Project Specific <br />Condition <br /> <br />57. EXISTING SEPTIC SYSTEMS: Any existing septic tanks within the property shall be <br />identified on the plans. Said systems must be properly abandoned in accordance with <br />Alameda County Code of Ordinances §15.18.070C. (Address this condition prior to <br />approval of the subdivision improvement plans) Project Specific Condition <br /> <br />58. GROUNDWATER WELLS: Any existing groundwater wells that will no longer be <br />needed for water supply to the existing home or irrigation shall be properly demolished <br />according to permit(s) issued by Zone 7 Water Agency in accordance with Alameda <br />County General Ordinance 0-2015-20. (Address this condition prior to approval of the <br />subdivision improvement plans) Project Specific Condition <br /> <br />59. CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted on a <br />plan sheet(s) in the submitted plans for construction. (Address this condition prior to <br />subdivision improvement plan approval) <br /> <br />60. ENGINEERING DIVISION FEES FOR SERVICE: The Engineering Division assesses <br />fees for services including plan-check, permit issuance, and inspection according to the <br />City’s adopted Master Fee Schedule. These fees are separate and distinct from fees <br />assessed by the Community Development Department (including Planning and Building <br />Division fees). The applicant is responsible for payment of all Engineering Division fees <br />prior to services rendered or permit issuance, whichever is first. (Address this condition <br />prior to subdivision improvement plan approval) <br /> <br />61. CITY ENGINEER SIGNATURE BLOCK: The following signature block shall be <br />depicted on the first sheet of the plans submitted for construction: “Approval of these <br />plans is for work within the street right-of-way and public utility systems within Public <br />Services Easements unless otherwise noted. Approval of these plans does not release <br />the developer of the responsibility for the correction of mistakes, errors, or omissions <br />contained therein. If during the course of construction of the improvements public <br />interest requires a modification or a departure from the specification and details of the <br />City of Pleasanton or these plans, the City Engineer shall have the authority to require