My WebLink
|
Help
|
About
|
Sign Out
RES 2024036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2024 9:39:48 AM
Creation date
6/10/2024 8:50:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/21/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 23 <br />target. As noted previously, the overall increase was initially higher, but several <br />reduction measures, including personnel adjustments as shown in Table 4 below, were <br />implemented including freezing six vacant positions. These actions have resulted in <br />decreasing personnel costs in the General Fund by approximately $1.06 million and <br />reducing the full-time equivalent (FTE) count by 0.4. Freezing a position is slightly <br />different than deleting a position; freezing a position involves removing all budgeted <br />dollars, but the FTE count remains the same. So while the FTE count is not impacted, <br />staff’s recommendation to freeze these six positions is essentially equivalent to <br />budgetarily reducing the FTE count by 6.0. Consistent with the City administration’s <br />ongoing effort to keep costs under control, this Mid-Term Budget does not include any <br />new permanent positions. <br /> <br />Table 4. Position Change Summary <br /> <br />Non-personnel Expenses <br />The non-personnel expenses identified in Table 3 above (all expense categories other <br />than Personnel) are projected to decrease by a net total of $0.03 million as described in <br />more detail below. Please note that similar to personnel cost reduction efforts, staff <br />examined all non- personnel budget categories and implemented reductions whenever <br />possible to keep costs under control. <br />x Transportation and Training – A net decrease of approximately $0.09 million <br />mostly due to reduced travel and training budget offset by a small increase in <br />maintenance costs due to aging vehicles. <br />x Repairs and Maintenance – A net decrease of approximately $0.88 million <br />based on reduced General Fund contribution of $0.73 million to the Park & <br />Median Replacement Internal Service Fund due to reallocation of the City’s tree <br />maintenance contract to the General Fund. An additional decrease of $0.15 <br />million to various contracts for general repairs and maintenance is recommended <br />as part of reduction efforts. <br />x Materials and Supplies – A net increase of approximately $0.77 million based <br />on a series of adjustments. As mentioned, the City’s tree maintenance contract <br />Impacted General Fund <br />Proposed Adjustment Department General Fund Non-General Fund Fiscal Impact <br />Freeze Chief Diversity Officer CMO - - ($165,094) <br />Freeze Sustainability Manager CDD - - (155,991) <br />Freeze Police Evidence Clerk PD - - (103,654) <br />Freeze Office Assistant CMO - - (138,870) <br />Freeze Recreation Coordinator L&R - - (159,764) <br />Freeze Recreation Supervisor L&R - - (212,501) <br />Reclassify Supervising Sr <br />Accountant to Sr Accountant Finance - - (20,921) <br />Move Management Analyst from City <br />Manager's Office to Public Works <br />and fund with Non-General Fund PW / CMO (0.40) 0.40 (108,063) <br />Move Emergency Services Manager <br />from Public Works to City Manager's <br />Office CMO / PW - - - <br />City Manager's Office to Public <br />Works PW / CMO - - - <br />Total (0.40) 0.40 ($1,064,858) <br />FTE Impact
The URL can be used to link to this page
Your browser does not support the video tag.