<br />Page 3 <br /> <br /> <br />• Removal of water line replacement from project (City Comment) <br />• Detailing nonstandard street light foundation for median lighting replacement (City Comment) <br />• Addition of parking lot improvements on private parcel (City Comment) <br />• Addition of driveway and drainage improvements on a private parcel (City Comment) <br />• Removal of a portion of driveway and drainage improvements on a private parcel (City Comment) <br />• Redesign of pedestrian refuge island in SW quadrant of Hopyard/Owens intersection (City Comment) <br /> <br />B.3 Maintenance Agreement <br />An updated maintenance Agreement between the City and Caltrans was required in order to obtain an Encroachment <br />Permit from Caltrans. Consor, supported the City to get an updated Maintenace Agreement with Caltrans by preparing <br />updated Maintenance Agreement Exhibits. <br /> <br />B.4 Storm Water Data Report <br />When the project was scoped, only Design Pollution Prevention checklists were required to document the stormwater <br />BMPs required for the project. For DEER approval, a full Storm Water Data Report (SWDR) was required. Consor <br />prepared and obtained approval for the SWDR. <br /> <br />B.5 Quality Management Plan <br />For DEER projects, Caltrans requires a Quality Management Plan detailing the Quality Assurance and Quality Control <br />processes that Consor and the City engaged in for project submittals. Consor prepared the QMP for City review and <br />Caltrans approval. <br /> <br />C. Soundwall Design Approval Coordination <br />C.1 Modified Standard Soundwall Design <br />The soundwall was initially designed utilizing available geotechnical reports from adjacent developments. Based on <br />input from the project geotechnical engineer, the seismic region of the project, the Caltrans Standard Plan Soundwall <br />wall could not be used, and the standard wall was modified to accommodate a higher PGA and seismic earth pressure <br />than the standard design. Consor designed the soundwall using Load Resistance Factor Design following AASHTO’s <br />“LRFD Bridge Specifications”, Eighth Edition, with the California Amendments and other Caltrans design manuals. <br />Consor prepared design calculations for Caltrans review and approval and prepared the final PS&E for the modified <br />standard soundwall. Four submittals of the sound wall calculations, plans, specs, estimate and geotechnical report were <br />made. Consor coordinated comment responses and incorporation for the geotechnical consultant as well. <br /> <br />C.2 Independent Design Check <br />Consor performed an independent check of the soundwall by an engineer that was not previously involved in the design. <br />Independent check consisted of a verification of the wall design by performing independent calculations and a plan <br />review. Based on comments made by the independent check and agreement to revisions by the checker and designer, <br />the plans and calculations were modified before submittal to Caltrans . <br />DocuSign Envelope ID: 586678E2-39ED-4705-A1F0-23B960519A89DocuSign Envelope ID: 4F87FD3C-C94B-445D-A7F7-B9041B616CE0