Laserfiche WebLink
<br /> Total: 110,535 <br />No permit and fees, no concrete included, no installation included. <br /> <br /> <br /> <br /> <br />Accepted By: <br /> <br />Date: <br /> <br /> Doors: Install pre-hung commercial door with <br />right-hand swing and threshold. <br /> Cove Base: Install rubber cove base in the new <br />room build-out. <br /> Foldable Tables: Install new foldable tables <br />(24x60) manufactured by Uline. Quantity: 8. <br /> T Bar: Install new T-bar grid with new T-bar tile in <br />the new room build-out. <br /> HVAC: Run new ducting for supply and return. <br />Connect to existing HVAC in existing offices. <br />Quantity: 2 supply, 1 return. <br /> <br /> <br />DocuSign Envelope ID: A09C14EB-53DE-46B6-BC81-69B61C978439