My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 1:56:35 PM
Creation date
5/16/2024 2:16:56 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
WILSON GENERAL CONTRACTING, INC. 2024558
Contract Record Series
704-05
Munis Contract #
2024558
Contract Expiration
7/31/2024
NOTES
CONSTRUCTION AGREEMENT OSC -PARKS RE-MODEL PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPINC PROPOSAL <br />General Contracting <br />737 Yellowstone Ct <br />Tracy, CA 95377 <br />fpincgencontracting@gmail.com <br />http:/romiefuentes.wixsite.com <br /> <br />City of Pleasanton DATE: 04/04/2024 <br />3333 Bush Road <br />Pleasanton, CA <br />Activity Qty Rate Amount <br />Framing: <br /> Frame new walls inside the workshop with metal <br />studs, including door opening. <br /> Frame a false wall next to the metal exterior wall <br />for insulation purposes. <br /> Frame a new window opening in the office area <br />(4x8 window to be installed separately). <br /> Block and install wood or metal backing for <br />foldable workshop tables hanging on the walls. <br />Electrical: <br /> Rough in new receptacles throughout walls and <br />worktable <br />receptacles. <br /> Install a switch for T-bar lights. <br /> Install T-bar LED lights (Quantity: 6, 2x2 lights). <br />Plumbing: <br /> Remodel existing wall mount sink. <br /> Cap hot and cold water supply lines inside wall. <br /> Cap ABS or copper waste drain inside wall. <br /> Dispose of all debris. <br />Insulation: <br /> Insulate all new walls with R13 or R19 insulation. <br /> <br />Drywall: <br /> Install 5/8 drywall on all new walls. <br /> Tape, skim all joints, and provide a smooth finish. <br /> <br />Primer and Paint: <br /> Prime and paint all new drywall, new doors, and <br />trims. <br /> <br />Additional Items: <br /> Ceiling Heater: Relocate the shop ceiling heater <br />approximately 3 feet away from the new wall. <br /> Fire Sprinkler: Drop new fire sprinkler heads in the <br />new room build-out. Connect to the existing <br />sprinkler above. Es <br /> Carpet: Prepare shop for floor installation of new <br />24'x24' carpet tiles (glue down). <br /> <br />DocuSign Envelope ID: A09C14EB-53DE-46B6-BC81-69B61C978439
The URL can be used to link to this page
Your browser does not support the video tag.