My WebLink
|
Help
|
About
|
Sign Out
ENGEO, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
E
>
ENGEO, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 2:20:02 PM
Creation date
5/7/2024 11:03:33 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
ENGEO, INC.
Contract Record Series
704-05
Munis Contract #
2024538
Contract Expiration
12/31/2025
NOTES
ENGINEERING DESIGN SERVICE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL <br />ENVIRONMENTAL <br />WATER RESOURCES <br />CONSTRUCTION SERVICES <br />COASTAL/MARINE GEOTECHNICS <br /> <br />2010 Crow Canyon Place, Suite 250 San Ramon, CA 94583 (925) 866-9000 Fax (888) 279-2698 <br />www.engeo.com <br /> <br />Project No. <br />P6621.002.000 <br /> <br />March 7, 2024 <br />Latest Revision March 25, 2024 <br /> <br />Mr. SM Saklaen, PE <br />Associate Civil Engineer <br />Public Works Department, Engineering Division <br />City of Pleasanton <br />PO Box 520 <br />Pleasanton, CA 94566 <br /> <br />Subject: Storm Damaged Repair Sites <br /> Pleasanton, California <br /> <br />PROPOSAL FOR ENGINEERING DESIGN SERVICES <br /> <br />Dear Mr. Saklaen: <br /> <br />The team of ENGEO Incorporated (ENGEO), WRA Incorporated (WRA), MacKay and Somps, <br />and Evans & DeShazo Incorporated (EDS), is pleased to present this revised proposal in regard <br />to various storm damaged sites located in the City of Pleasanton, as summarized in the City’s <br />Request For Proposal dated January 13, 2024. Based on further clarification of the City’s intent <br />at each repair area, during a meeting on February 26, 2024, we have revised our cost proposal <br />and scope of services for the projects as presented in this revised proposal. <br /> <br />For the purposes of the environmental review, permitting, and 100 percent plans, specifications and <br />estimate packages for these repair efforts, the storm repair project sites will be grouped as follows. <br /> <br />• Bernal Project (Bernal Trails) and;. <br />• Combined Sites Project (Oak Tree Farm, Sassafras, and Vineyard) <br /> <br />One set of documents will be prepared for both the Combined Sites (CS) Project and for the Bernal <br />Project. We believe combining the projects into these two separate packages will help streamline <br />resource agency permitting and project bidding. <br /> <br />We are also providing a separate scope of services to provide preliminary engineering studies for a <br />realignment of a portion of a City of Pleasanton storm drain located near the intersection of Sunol <br />Boulevard and Sycamore Road where recent flooding has occurred. <br /> <br />SCOPE OF SERVICES <br /> <br />Phase 001 – Land Surveying <br /> <br />MacKay and Somps will provide a land survey of each of the four repair areas. The surveys will <br />contain existing storm drain information, limits of approximate property lines , and topographic <br />information that will be used as a basis of design for each repair area. <br /> <br />Exhibit A <br />DocuSign Envelope ID: 9D598DAC-5F24-41FA-B827-97D013A47ECADocuSign Envelope ID: CEB20404-63F8-4DC5-AE6A-C5FC89DB6F87
The URL can be used to link to this page
Your browser does not support the video tag.