Page 5 of 5 <br />Drain Improvements (Sunol Boulevard), CIP No. 24662, which have a combined current <br />balance of $985,457. FEMA requires each project’s expenditures to be tracked separately, so <br />three new CIP projects, East Vineyard Detention Pond Outfall Repairs (CIP No. 24676), Oak <br />Tree Farm Outfall Repairs and Channel Stabilization (CIP No. 24677) and Augustin Bernal <br />Trail Creek Crossing Culverts and Retaining Wall (CIP No. 24678), were created for those <br />purposes for a total of five projects. The ENGEO contract was broken up into separate tasks <br />based on the new projects and will be billed to the individual projects. Total expenditures of <br />$822,000 include ENGEO’s contract for $782,407 and the project design contingency of <br />$39,593. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />SM Saklaen, Associate Civil <br />Engineer <br />Siew-Chin Yeong, Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Design Professional Services Agreement with ENGEO Incorporated <br />2. Funding and Expenditure Summary <br /> <br />DocuSign Envelope ID: CEB20404-63F8-4DC5-AE6A-C5FC89DB6F87