Exhibit A of OWNER Agreement December 21, 2023 <br />CITY OF PLEASANTON – LIBRARY LIGHTING CONSTRUCTION SUPPORT Page 2 of 3 <br />II. SCOPE OF SERVICES <br />A. PHASE 10.00 – PRE-DESIGN AND ASSESSMENT – Not included in this agreement <br />B. PHASE 10.01 - PROGRAMMING AND CONCEPT DESIGN – Not included in this agreement <br />C. PHASE 10.02 COMMUNITY & STAKEHOLDER OUTREACH – Not included in this agreement <br />D. PHASE 30.0 - SCHEMATIC DESIGN – Not included in this agreement <br />E. PHASE 30.1 - DESIGN REVIEW SUBMITTAL DOCUMENTS – Not included in this agreement <br />F. PHASE 30.3 - DESIGN REVIEW REVISIONS – Not included in this agreement <br />G. PHASE 40.0 - DESIGN DEVELOPMENT – Not included in this agreement <br />H. PHASE 50.0 - CONSTRUCTION DOCUMENTS – Not included in this agreement <br />I. PHASE 50.2 - GOVERNMENT AND AGENCY PLAN REVIEW – Not included in this agreement <br />J. PHASE 60.0 – BIDDING – Not included in this agreement <br />K. PHASE 70.0 - CONSTRUCTION ADMINISTRATION <br />1. Prior to start of Construction, DAHLIN, OWNER, and General Contractor will have a pre-construction <br />meeting to establish expectations for performance of Construction Administration and the scope of <br />services described below. If the scope of services described below for Construction Administration <br />are adjusted during or after this meeting, Additional Services may be required. <br />2. As the PROJECT proceeds into Construction, DAHLIN will provide Construction Administration <br />services, limited to one hundred twenty (100) hours of professional services. The scope and fee <br />herein are based on an estimated three (3) month construction period. Services required beyond that <br />period and/or beyond the estimated hours are Additional Services. Scope may include: <br />a. Interpretation of the documents and responding to Requests for Information (RFI’s); <br />b. Reviewing and processing submittals limited to; <br />i. Review of initial submittal and one (1) re-submittal per product or material classification. <br />ii. Additional review of submittals are Additional Service. <br />c. Issuing ASI’s and processing Change Orders as requested by CITY; <br />d. Construction Project meetings and site visits limited to: <br />i. Up to two (2) onsite meetings <br />ii. Up to one (1) onsite meeting and one (1) punch list site visits by DAHLIN’s Consultants, per <br />discipline. <br />e. PROJECT Completion: <br />i. DAHLIN will provide up to one (1) onsite visits for punch. Backpunch (2nd+ rounds) are not <br />included; <br />ii. One (1) site visit (each) to determine date of Substantial Completion and Final Completion. <br />L. PHASE 70.1 – AS DESIGN DRAWINGS <br />1. Compilation of DAHLIN’s designs for PROJECT including the original Construction Documents plus <br />all addenda, Architect’s Supplemental Instructions, Change Orders, Construction Change Directives <br />and minor changes in the work as appropriate to reflect the design changes <br />2. Incorporation of Contractor's redlines and field changes to the Design Documents can be provided as <br />an additional service. <br />Page 195 of 201 <br />DocuSign Envelope ID: 3A632571-5721-4508-8A88-F0EF63D614A7