Laserfiche WebLink
<br />4 <br /> <br /> <br />TECHNICAL SCOPE OF SERVICES <br />The following is a summary of key tasks and deliverables for the 3200 Hopyard Road Residential <br />Project CEQA compliance. <br /> <br />Task 1 Project Initiation <br />The objective of this task is to participate in a kick-off meeting with City staff to review existing <br />documentation for the project and identify the key issues. Vice President, Nick Pappani, will serve <br />as the Project Director and Division Manager/Air Quality Specialist, Angela DaRosa, will serve <br />as the Project Manager. <br /> <br />Raney will complete the following: <br />• Participate in a kick-off meeting with City staff and applicant team, if necessary; <br />• Review existing documentation for the project and identify key issues; <br />• Establish communication protocols; <br />• Refine the scope, if necessary, with any revisions for the City to approve; and <br />• Perform a site visit. <br /> <br />Task 2 Peer Review of Provided Reports <br />The objective of this task is to conduct CEQA-level peer reviews of all provided technical reports, <br />with the exception of the Transportation Assessment Technical Memorandum, in order to <br />determine if any revisions are necessary for purposes of ensuring their sufficiency for use in the <br />environmental analysis. If it is determined that revisions to the reports are necessary, Raney would <br />coordinate with the City to have the reports revised. If a technical peer review from a third-party <br />expert is deemed necessary, Raney would coordinate with the City and would propose to sub- <br />contract with a technical consultant to conduct the peer review. <br /> <br />Raney will complete the following: <br />• Conduct CEQA-level peer review of all provided technical reports, with the exception of <br />the Transportation Assessment Technical Memorandum; <br />• Preparation of comments on technical reports, if necessary; and <br />• Coordinate with the City to have reports revised or technical peer review conducted, if <br />necessary. <br /> <br />Task 3 Prepare Administrative Draft Modified IS Checklist <br />The objective of this task is to prepare an Administrative Draft version of the Modified IS Checklist <br />for review by City staff. As previously discussed, the IS Checklist will be prepared in a modified <br />Appendix G format and will address all the issues identified in the environmental checklist, with <br />the caveat that environmental effects previously addressed as significant in the General Plan EIR <br />will not require further analysis. Rather, for these impacts, Raney will summarize the General Plan <br />EIR analysis and identify any General Plan EIR mitigation measures applicable to the proposed <br />project. <br /> <br />Air Quality and GHG Emissions <br />Raney will rely upon the applicant-provided Air Quality Technical Report, GHG Emission <br />Compliance Checklist, and Health Risk Assessment (HRA). As discussed in Task 2, Raney will <br />DocuSign Envelope ID: 3FA212B2-C9C9-4BE6-8FD2-66034B064F8CDocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA