My WebLink
|
Help
|
About
|
Sign Out
PC-97-22
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:06 AM
Creation date
11/17/2004 4:33:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/26/1997
DOCUMENT NO
PC-97-22
DOCUMENT NAME
Z-96-275/UP-97-05
NOTES
VALLEY COMMUNITY CHURCH
NOTES 3
APPROVED /CUP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-22 <br />Page 4 <br /> <br />EXHIBIT "B" <br />Conditions of Approval <br />Case Z-96-27S/UP-97-0S <br />Valley Community Church <br /> <br />PLANNING <br /> <br />1. Development shall be substantially as shown on the development plans, written narrative, <br />and colorboard, Exhibit "A", dated "Received" December 30, 1996, and February 14, <br />1997, on file with the Planning Department, except as modified by the following <br />conditions. Minor changes to the plans may be allowed subject to the approval of the <br />Planning Director if found to be in substantial conformance to the approved exhibits. <br /> <br />2. The specific design of the future 7,200 square foot educational building shall be subject <br />to separate design review approval by the Planning Commission prior to its construction. <br /> <br />3. With the exception of the future 7,200 square foot educational building and the future 40 <br />space parking lot, all site improvements shown on the plans shall be constructed as part <br />of Phase 3. <br /> <br />4. The 6 ft. concrete wall shall be nearing completion, subject to the Planning Director's <br />approval upon consultation with the Tiffany Lane Homeowners Association, prior to the <br />start of construction on the sanctuary/educational building. The parking lot bollard lights <br />shall be installed with the parking lot and landscape improvements. <br /> <br />5. The applicants shall obtain approval from the Pleasanton Unified School District prior to <br />installation of the access gates on the eastern property line fence. <br /> <br />6. The modular buildings may be located and used at the subject property until December 1, <br />2001, or until the start of construction of the last building phase (Phase 4), whichever <br />occurs first. The applicants shall maintain and paint the buildings, as necessary, to keep <br />them in a clean and neat condition. <br /> <br />7. A lOft. wide landscape planter shall be provided along north side of future educational <br />building. Trees, shrubs and groundcover shall be installed within the planter area. Final <br />design of the planter area shall be shown on the design review submittal for the future <br />educational building. <br /> <br />8. A final landscape plan and irrigation plan shall be submitted to and approved by Planning <br />Director as part of the building permit plan set prior to issuance of an on-site permit. <br />Said landscape plan shall be consistent with the approved landscape plan plus any <br />conditions of approval, and shall be detailed in terms of species, location, size, quantities, <br />and spacing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.