My WebLink
|
Help
|
About
|
Sign Out
PC-97-18
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:05 AM
Creation date
11/17/2004 4:11:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/12/1997
DOCUMENT NO
PC-97-18
DOCUMENT NAME
PUD-81-20-69D
NOTES
SIGNATURE PROP/HACIENDA
NOTES 3
APPROVED OFFICE BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-18 <br /> <br />Page 7 <br /> <br />31. The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the developer agrees and acknowledges that building permit approval may <br />be withheld if sewer capacity is found by the City not to be available. <br /> <br />32. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the developer is participating in the program. Notwithstanding <br />the developer's participation in such a program, the City may withhold building permits if <br />the City determines that sufficient water is not available at the time of application of <br />building permits. <br /> <br />Building <br /> <br />33. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />34. The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasanton. These plans shall be approved by the Director of <br />Building Inspection prior to the issuance of a building permit. The site development plan <br />shall include all required information to design and construct site, grading, paving, <br />drainage, and utilities. Specific items to be indicated on the site development plan <br />necessary to construct the improvements are to be in accordance with the City of <br />Pleasanton Private Development Design Guidelines adopted April 15, 1986. <br /> <br />35. The paving sections for the on-site parking and drive areas shall be designed on the basis <br />of an R -Value test and a traffic index to carry the anticipated traffic loads. This design <br />shall be subject to the approval of the Director of Building Inspection. The minimum <br />paving section shall be 2" AC. on 6" of A.B. The minimum AC. pavement slope shall <br />be 1 %. For pavement slopes of less than I %, the surface runoff shall be carried in a <br />concrete gutter to an acceptable point of discharge. The minimum slope for concrete <br />gutter shall be 0.5%. <br /> <br />36. A sanitary sewer sampling manhole shall be provided on each of the sanitary sewer <br />lateral from each building, unless otherwise waived by the Director of Building <br />Inspection. <br /> <br />37. Prior to issuance of a building permit, the applicant shall pay the applicable Zone 7 and <br />City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the developer shall pay any applicable DSRSD sewer permit fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.