<br />.12.. On-Site Operations <br /> <br />79. All existing wells on the site shall be removed or sealed, filled and abandoned pursuant to <br />Alameda County Ordinance 73-68, prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for construction water. Any wells <br />designated for abandonment or any wells, encountered during construction, are to be <br />destroyed in accordance with a permit obtained from Zone 7. <br /> <br />80. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />Services. <br /> <br />81. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />82. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />83. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />Eo. Urban Clean Water Run-Off <br /> <br />84. The applicant shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution. <br /> <br />Case PUD-96-02 <br /> <br />Conditions of Approval <br /> <br />Page B-15 <br />