Laserfiche WebLink
Figure 1-9: Irrigation Bill Impacts <br />Irrigation Bill Impacts(1-1/2 inch meter, 72 ccf, Stage 2) <br />800 696.13 <br />700 580.19 576.61 <br />600 <br />500 <br />400 <br />200 <br />100 <br />80 <br />Proposed Bill No Proposed Bill Stage Proposed Bill Stage <br />Drought- 72 ccf 2 -20% Reduction 2 - No Reduction <br />Base Fixed Charge 117.23 117.23 117.23 <br />Base Commodity Charge 462.96 370.37 462.96 <br />Drought Charge 0.00 89.01 115.94 <br />Total Bill 580.19 576.61 696.13 <br />14 CITY OF PLEASANTON