Laserfiche WebLink
<br />2023-2031 Housing Element City of Pleasanton | 28 <br />3. Other High Density Sites Larger than 10 Acres (Hacienda Terrace, Metro 580, <br />Signature Center 3, and Oracle): Conduct outreach with the owners of these properties <br />to discuss development constraints and opportunities, and to provide technical and <br />planning support to facilitate development and opportunities. Such support may <br />include offering incentives such as modification of parking ratios / relief from <br />replacement parking requirements for commercial uses elsewhere on the site; <br />assistance with developing site planning concepts; and advice/assistance on the steps <br />to subdivide into appropriate sizes (e.g., 1 to 10 acres) and re-zone the properties for <br />the desired residential uses. For those high density sites larger than 10 acres where <br />the City has illustrated subareas within these larger sites that reflect areas expected <br />to be redeveloped or infilled with housing (i.e., Metro 580, Oracle, Hacienda Terrace, <br />and Signature Center3), to improve the feasibility for redevelopment with housing, the <br />City shall allow (without a requirement for legislative approval) flexibility in the precise <br />location of the future housing within the larger site, provided that minimum densities <br />and maximum unit counts remain within the ranges listed for each site in Appendix B <br />(exempting additional density allowable by density bonus law). <br />• Responsible Agency: Planning Division <br />• Time Period: Complete concept-level planning (Framework) for the Stoneridge Mall <br />(March 2023). Complete and adopt/approve detailed Master Plans for Stoneridge Mall site <br />(July 2025) and Kiewit property (July 2024). Outreach to property owners for other large <br />sites: June 2023, and coordination to offer technical support by October 2024. If the City’s <br />efforts are not resulting in progress toward housing entitlement/development on large sites <br />by October 2026, the City will review and revise support efforts by May 2027. The City’s <br />action shall be commensurate with the level of progress toward housing <br />entitlement/development on large sites (e.g., if no progress has been made, a rezoning <br />action of additional sites may be required). <br />• Funding Source: Planning Division Budget, developer funds <br />• Quantified Objective: 200 lower-income units approved or constructed on large sites by <br />January 2031 <br /> <br /> <br /> <br /> <br />3 Individual parcels within the Signature Center Area (Area 6) are less than 10 acres. While not required, <br />the City is including the Signature Center Area (entire 14.66 acres in total) in this Program to further facilitate <br />development of this Area.